Filter Search


Asia


Location Summary Deadline
India Composite Pipe ( Pe-al-pe ) Size 1620 Mm As Per Is:15450/2022 Amndt-1. Packing instruction-pi042. .#* Composite Pipe ( Pe-al-pe ) Size 1620 Mm As Per Is:15450/2022 Amndt-1. Packing Instruct ion-pi042. [ Warranty Period: 30 Months After The Date Of Deliver 2026-01-05
Japan Copy Machines, 1 Set (including Maintenance) 2026-01-05
Japan Electricity To Use In The Building Of The Kitakyushu Port And Airport Office And Other 9 Places 2026-01-05
India Vendors Approved By Any Centralized Vendor Approving Agencies For Developmental Orders With Condition Of Prototype Approval And/or Field Trial May Be Given Developmental Order For 5% Of Net Procurable Quantity (npq) Within Or Outside Npq. However, The Tot 2026-01-05
India Lateral Rubber Stop For Air Spring.suspension .#* Lateral Rubber Stop For Air Spring.suspension To Icf Drg.no.dmu/dpc 5-0-5-502, Al t.c/3(small C By 3) [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cate 2026-01-05
India Element Strainer Fuel Suction .#* Element Strainer Fuel Suction. (filter Element, Suction Strainer). Emd & Rdso Drg N o. 9324489 Rev Aa & Skdp 3675 Alt1 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cat 2026-01-05
-Design-And-Construction-Of-Formation-In-Embankments,-Cutting-Including-Blanketing,-Major-Bridges,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-,fencing-Works-And-Station-Boxes-Of-Naga>India -Design-And-Construction-Of-Formation-In-Embankments,-Cutting-Including-Blanketing,-Major-Bridges,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-,fencing-Works-And-Station-Boxes-Of-Naga>Corridor 2 Package 2
Design And Construction Of Formation In Embankments, Cutting Including Blanketing, Major Bridges, Minor Bridges, Rub, Ers/retaining Wall, Sacrificial Retaining Wall, Drains, Boundary Wall ,fencing Works And Station Boxes Of Naga
-Design-And-Construction-Of-Formation-In-Embankments,-Cutting-Including-Blanketing,-Major-Bridges,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-,fencing-Works-And-Station-Boxes-Of-Naga>2026-01-05
Japan Transportation Of Goods Services 2026-01-05
-Design-And-Construction-Of-Elevated-Viaduct-Including-Ramps-Of-Elevated-Section-Of-Length-7.795-Km-Ror-Including-Design-And-Construction-Of-Double-Decker-Station-At-Mattikere-And-Construction-Of-Balance-Works-At-Bennigenahalli-S>India -Design-And-Construction-Of-Elevated-Viaduct-Including-Ramps-Of-Elevated-Section-Of-Length-7.795-Km-Ror-Including-Design-And-Construction-Of-Double-Decker-Station-At-Mattikere-And-Construction-Of-Balance-Works-At-Bennigenahalli-S>Corridor 2 Package 1
Design And Construction Of Elevated Viaduct Including Ramps Of Elevated Section Of Length 7.795 Km Ror Including Design And Construction Of Double Decker Station At Mattikere And Construction Of Balance Works At Bennigenahalli S
-Design-And-Construction-Of-Elevated-Viaduct-Including-Ramps-Of-Elevated-Section-Of-Length-7.795-Km-Ror-Including-Design-And-Construction-Of-Double-Decker-Station-At-Mattikere-And-Construction-Of-Balance-Works-At-Bennigenahalli-S>2026-01-05
-Design-And-Construction-Of-Formation-In-Embankments,-Cuttings-Including-Blanketing,-Ramp,-Rob,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-And-Fencing-At-grade-Section-Of-5.80-Km-And>India -Design-And-Construction-Of-Formation-In-Embankments,-Cuttings-Including-Blanketing,-Ramp,-Rob,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-And-Fencing-At-grade-Section-Of-5.80-Km-And>Corridor 2 Package 3
Design And Construction Of Formation In Embankments, Cuttings Including Blanketing, Ramp, Rob, Minor Bridges, Rub, Ers/retaining Wall, Sacrificial Retaining Wall, Drains, Boundary Wall And Fencing At-grade Section Of 5.80 Km And
-Design-And-Construction-Of-Formation-In-Embankments,-Cuttings-Including-Blanketing,-Ramp,-Rob,-Minor-Bridges,-Rub,-Ers/retaining-Wall,-Sacrificial-Retaining-Wall,-Drains,-Boundary-Wall-And-Fencing-At-grade-Section-Of-5.80-Km-And>2026-01-05
Whats app