Filter Search


Asia


Location Summary Deadline
India C.i Bearing Plate For Ballast Less Track Laid With 60kg/m/(uic) Rail .#* C.i Bearing Plate For Ballast Less Track Laid With 60kg/m/(uic) Rail With Shifted Rail Seat as Pre Drg No :- Mrc/w/pw/13-93 (mod 2 Rev) As Per Drg.no. Mrc/w/pw/13-93 (mod 2 Rev) [ Wa 2025-10-15
India Led Light Fitting .#* Led Light Fitting For Doorway/gangway Area For Lhb Ac Coaches Type N (9w) As Rcf Drg no. Lw76099 Alt. B Conforming To Rdso Spec. No. Rdso/pe/spec/tl/0091-2016 (rev - 1), Rcf Annex. 1,2,3. [ Warranty Period: 30 Months After The Date O 2025-10-15
-Recarpeting-Of-Runway-And-Taxiways,-Construction-Of-Emergency-Road-From-Runway-End-To-Crash-Gate-,-Resa,-Peripheral-Road,-Storm-Water-Drain,-Watch-Towers,-Preparation-Of-Runway-Basic-Strip,-Sitc-Of-Electr>India -Recarpeting-Of-Runway-And-Taxiways,-Construction-Of-Emergency-Road-From-Runway-End-To-Crash-Gate-,-Resa,-Peripheral-Road,-Storm-Water-Drain,-Watch-Towers,-Preparation-Of-Runway-Basic-Strip,-Sitc-Of-Electr>Madc/nanded Airport/ 2025/runway Recarpeting
Recarpeting Of Runway And Taxiways, Construction Of Emergency Road From Runway End To Crash Gate , Resa, Peripheral Road, Storm Water Drain, Watch Towers, Preparation Of Runway Basic Strip, Sitc Of Electr
-Recarpeting-Of-Runway-And-Taxiways,-Construction-Of-Emergency-Road-From-Runway-End-To-Crash-Gate-,-Resa,-Peripheral-Road,-Storm-Water-Drain,-Watch-Towers,-Preparation-Of-Runway-Basic-Strip,-Sitc-Of-Electr>2025-10-15
-Improvements-To-Riding-Quality-Works-To-The-Government-Roads-In-Sendurai-h-c-And-M-Sub-Division-Jurisdiction-vpm-097>India -Improvements-To-Riding-Quality-Works-To-The-Government-Roads-In-Sendurai-h-c-And-M-Sub-Division-Jurisdiction-vpm-097>Vpm-097-cridp 2025-26
Improvements To Riding Quality Works To The Government Roads In Sendurai-h-c And M Sub Division Jurisdiction-vpm-097
-Improvements-To-Riding-Quality-Works-To-The-Government-Roads-In-Sendurai-h-c-And-M-Sub-Division-Jurisdiction-vpm-097>2025-10-15
Mongolia Construction Of New Asphalt Paved Road For Section From Tsagaankhairkh An- Tsagaanchuluut (60 Km) 2025-10-15
-Scope-Of-Work-Includes-Construction-Of-Retaining-Wall-Including-The-Cost-Of-Labour-And-Material-At-Site.>India -Scope-Of-Work-Includes-Construction-Of-Retaining-Wall-Including-The-Cost-Of-Labour-And-Material-At-Site.>Construction Of Retaining W...
Scope Of Work Includes Construction Of Retaining Wall Including The Cost Of Labour And Material At Site.
-Scope-Of-Work-Includes-Construction-Of-Retaining-Wall-Including-The-Cost-Of-Labour-And-Material-At-Site.>2025-10-15
India Large Span Wire Ending .#* Large Span Wire Ending Clamp (130) Complete Assembly With All Fasteners Ri No 1131, 1143, 1102, Snap Head Pin Of 20 Dia, Plane Washer 20 Mm, And Copper Split Pin Of 4x36 As Per Rds o Drg No: Eti/ohe/p/1140 Rev. B Or Latest And E 2025-10-15
India Consultancy Services For Preparation Of Detailed Project Report Of Construction Of Churu Ring Road And Shahpura Bypass And Nathdwara Bypass In The State Of Rajasthan 2025-10-15
India Printing Of Student Progress Card & Satat Mulyankan Panji For Half Yearly Evaluation Printed Student Progress Card, Satat Mulyankan Panji. 2025-10-15
Philippines Silicon Polyurethane Coating For Basketball Court Flooring @ Mega Gymnasium Pb-lap-2025-089 2025-10-15
Whats app