Filter Search


Asia


Location Summary Deadline
Nepal Construction Of Shivalaya Khaneta Road Upgrading Project Shivalaya-2 Jajarkot (lisp Project) 2026-01-27
Malaysia Electrical Installation To Complete The Remaining Work Of Au3 Fire And Rescue Station, Ampang, Selangor - Re-tender 2026-01-27
India Fixing Of Work Near Patwa Market Road Bharat Talkies Ward 19 Zone 05 2026-01-27
Japan Electric Power Supply To Be Used At 9 Locations Under The Jurisdiction Of The Shizuoka Labor Department Contracted Power : 484kw, Planned Annual Power Use : 799708kwh 2026-01-27
India Tender For Empanelment Of Consultant For Implementation Of Various Schemes Of The Corporation. 2026-01-27
India Construction Of Mrf Center Under Sbm 2.0 Municipal Council Jhundpura Dist Morena 2026-01-27
-Online-Tender-For-The-Rate-Contract-And-Supply-Of-Pharmaceuticals-To-Various-Hospitals-Of-Government-Of-Madhya-Pradesh-For-A-Period-Of-18-Months>India -Online-Tender-For-The-Rate-Contract-And-Supply-Of-Pharmaceuticals-To-Various-Hospitals-Of-Government-Of-Madhya-Pradesh-For-A-Period-Of-18-Months>T-791/mpphscl/pharma/rc/2025 Date-26-12-2025
Online Tender For The Rate Contract And Supply Of Pharmaceuticals To Various Hospitals Of Government Of Madhya Pradesh For A Period Of 18 Months
-Online-Tender-For-The-Rate-Contract-And-Supply-Of-Pharmaceuticals-To-Various-Hospitals-Of-Government-Of-Madhya-Pradesh-For-A-Period-Of-18-Months>2026-01-27
India Fabrication Of A Frame From Suitable Wood For Packing Air Springs. The Frame Should Be Of Adequate Strength For Transporting And Lifting. The Packing Must Ensure That The Air Spring Does Not Get Damaged During Transport And Lifting. The Total Weight Of On 2026-01-27
India Unsintered Ptfe Tape Etc. .#* Unsintered Ptfe Tape Size. 0.075 Mm Thick X 12%a0 Mts. Roll For Threaded Sealing Applic ation To Bs Spec. No.-4375/1968. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Categ 2026-01-27
India Tr-31/2025 Supply, Erection And Civil Including Testing N Commissioning Of 220kv Outdoor Type Hybrid Gis At 220kv Substation Ujjain On Total Turn-key Basis 2026-01-27
Whats app