Filter Search


Asia


Location Summary Deadline
India Voltmeter Battry (position No.116) .#* Voltmeter Battry (position No.116) As Per Clw Spec.no. Clw/es/3/0073 And Ab b Document No. 3ehp590545r0001, Clw Drg.no.-clw/es/3/sk1/0073. [ Warranty Period: 30 Mo nths After The Date Of Delivery ] ] 2025-10-09
India Ss 304 Pipe Clamp With 02 Nos. .#* Ss 304 Pipe Clamp With 02 Nos. M10 Nut A270 & 02 Nos. Spring Washer Is: 2062 For 25 Mm B ore, Drg. No. Cc 35326, Alt. B [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-09
India Procurement Of Ultrasonic Surgical Aspirator (cusa) Machine For The Department Of Surgical Oncology At Medical College, Kolkata. The Work Includes Supply And Commissioning Of The Equipment As Per The Schedule Of Requirements. Ultrasonic Surgical Aspirator 2025-10-09
Bangladesh Construction Of Retaining Wall With Pre-cast Pile & Site Development Works Surrounding Pond Of Vice-chancellor S Office-cum-residence At Bou Campus, Gazipur-1705. 2025-10-09
India Public Auction For The Sale Of Immovable And Movable Property Belonging To M/s. Patil Polymer Products, Including Land And Building Along With Plant And Machineries And Stock. The Auction Is Being Conducted Due To Recovery Action Against Defaulted Borrowe 2025-10-09
Bangladesh Procurement Of Rapid Pass Felica Ic Cards And Associated Services. 2025-10-09
India Avr (automatic Voltage Regulator) Model No. Mx321-mk2, Part No. E000-23212 For 500kva, 750v Stamford Make Alternator Of Cummins Diesel Alternator Set In Lhb power Car Confirming To Rdso Specification Rdso/pe/spec/ac/0084-2008 Rev-1. .#* Avr (automatic Vol 2025-10-09
Indonesia Detailed Engineering Design For Area Based Ponds Including Feasibility Study Area Based Ponds And Master Plan 2025-10-09
India Digital Outside Micrometers .#* Digital Outside Micrometer With Interchangeable Anvils, Range: 150-300 Mm, Res olution: 0.001 Mm. Acceptable Makes: Mitutoyo, Model No : 340-252 Or Equivalent, .model Of Spi/ S tarret/ Vogel /igaggermay [ Warranty Period: 3 2025-10-09
India Transfer Of Stressed Loan Exposures By Sbi, Involving A Pool/portfolio Of Secured And Unsecured Loan Accounts For Transfer To Asset Reconstruction Companies (arcs) Or Permitted Transferees. The Transfer Is Subject To Final Approval By The Competent Author 2025-10-09
Whats app