Filter Search


Asia


Location Summary Deadline
Malaysia Tender Are Invited For Replacing The Suspension Bridge At Kg. Rakeh, Rompin, Pang visit Information Is As Follows: visit Date: 14/11/2024 visit Time: 11:00 Am visit Location: Bandar Tun Abdul Razak Multipurpose Hall (in Front Of Police Station), Felda K 2024-12-17
Nepal Procurement And Supply Of Sanitary Pads 2024-12-17
Nepal Bids Invitation For Goods 2024-12-17
India Supply Of Silodosin 8 Mg + Dutasteride 0.5 Mg (combipack/kit/single Unit) ] 2024-12-17
India Rewinding / Reconditioning Of Ceiling Fan, Water Cooler, Ac, Exhaust Fan And High Mast Motors On Annual Rate Contract Basis For The Period Of Two Years. 2024-12-17
India E Auction Sale Of Property, House, Plot, Plant And Machine. 2024-12-17
Georgia ????? ??????????????? ??????????? ??????????? multifunctional Electronic Water Meters procurement Type: Electronic Tender Without Reverse Auction(nat) procuring Entities: Ltd ,,batumi Water" procurement Announcment Date: 15.11.2024 bids Accepted From: 12 2024-12-17
-Toothed-Segment.drawing-No:w/bg-6183-A,-Alt.5.-[-Warranty-Period:-30-Months-Afterthe-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Per>India -Toothed-Segment.drawing-No:w/bg-6183-A,-Alt.5.-[-Warranty-Period:-30-Months-Afterthe-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Per>Supply Of Toothed Segment.drawing No:w/bg-6183 A, Alt.5.
Toothed Segment.drawing No:w/bg-6183 A, Alt.5. [ Warranty Period: 30 Months Afterthe Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Per
-Toothed-Segment.drawing-No:w/bg-6183-A,-Alt.5.-[-Warranty-Period:-30-Months-Afterthe-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Per>2024-12-17
India Repairs To Side Drain At Ngtn Yard To Avoid Flooding On Shunting Line And Main Line Under Aden(e)pnvl B) Operating And Maintenance Of Water Supply Valves, Pump Rooms, Storage Tanks And Distribution For Water Supply For Two Years [2024-25 & 2025-26] Under 2024-12-17
Nepal Road Upgrading Works Along Sulichour-pharsa-kavra-kwaligau(sulichour-parsa) Motorbato Staronnati Tatha Kalopatre Yojana In Rolpa District 2024-12-17
Whats app