Filter Search


Asia


Location Summary Deadline
-Centre-Pivot-Pin-Drawing-No.:--T-0-6-602,-Alt-.-(c)-&-(14)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>India -Centre-Pivot-Pin-Drawing-No.:--T-0-6-602,-Alt-.-(c)-&-(14)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>Supply Of Centre Pivot Pin
Centre Pivot Pin Drawing No.:- T-0-6-602, Alt . (c) & (14) [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac
-Centre-Pivot-Pin-Drawing-No.:--T-0-6-602,-Alt-.-(c)-&-(14)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>2024-12-17
India Supply Of Implants Items. 2024-12-17
qty:5000
>India
qty:5000
>Supply Of Led Tube Light (retrofit Type) (q2)
qty:5000
qty:5000
>2024-12-17
Japan Luminescence/fluorescence In Vivo Imaging System Set 2024-12-17
qty:3
>India
qty:3
>Supply Of Cnc Vertical Machining Centre With Spindle Rpm Maximum 8000
qty:3
qty:3
>2024-12-17
Bangladesh Repair Lightning Arresters And Supply Spare Parts For 2 Years Ukhiya Upazila Under Emergency Assistance Project For Water Supply And Sanitation At Ukhiya And Teknaf Upazila In Cox S Bazar. Fy-2024-25 2024-12-17
Nepal Construction Of People Walkway Below Tinkune And Manahara-dovan Bridge At Ka.ma.na.pa.32 ,kathmandu 2024-12-17
-Earth-Discharge-Rod-Assembly-For-25kv-Ac-Traction-To-Be-Supplied-Along-With-Two-Rail-Clamps,-Top-Clamp-(10mm-To-20mm-Dia-Conductor)-And-Cable-9-Meter-(7.5-+1.5)m-Long-With-Size:248/0.45mm-And-Canvas>India -Earth-Discharge-Rod-Assembly-For-25kv-Ac-Traction-To-Be-Supplied-Along-With-Two-Rail-Clamps,-Top-Clamp-(10mm-To-20mm-Dia-Conductor)-And-Cable-9-Meter-(7.5-+1.5)m-Long-With-Size:248/0.45mm-And-Canvas>Supply Of Earth Discharge Rod Assembly For 25kv Ac
Earth Discharge Rod Assembly For 25kv Ac Traction To Be Supplied Along With Two Rail Clamps, Top Clamp (10mm To 20mm Dia Conductor) And Cable 9 Meter (7.5 +1.5)m Long With Size:248/0.45mm And Canvas
-Earth-Discharge-Rod-Assembly-For-25kv-Ac-Traction-To-Be-Supplied-Along-With-Two-Rail-Clamps,-Top-Clamp-(10mm-To-20mm-Dia-Conductor)-And-Cable-9-Meter-(7.5-+1.5)m-Long-With-Size:248/0.45mm-And-Canvas>2024-12-17
India Construction Of 4 Nos. 132 Kv Grid Sub-stations At 132 Kv Gss Baachhadao, 132 Kv Gss Pachpadra, 132 Kv Gss Borawas & 132 Kv Gss Saila Along With Associated Lines (20 Km S/c, 82.5 Km D/c Approx.) & 3 Nos. 132 Kv Bays. 2024-12-17
India Operation And Maintenance Of Effluent Treatment Plant At Coaching Depot Puri For A Period Of Four Years. 2024-12-17
Whats app