Filter Search


Asia


Location Summary Deadline
India Development And Construction Of Stabling Yard (indroda Depot) At Indroda Circle Including Associated E&m Works In Connection With Metro Rail Project Phase - 2 2024-12-23
Bangladesh Procurement Of Office Equipment 2024-12-23
Thailand Labor Relations Service Contract 2025 2024-12-23
Thailand Purchase Of 22 Kv Air Cable Steel, Curved System, Quantity 300 Pieces, 1 Item, Number 67h0800056, By Specific Method. 2024-12-23
India Supply Of Tapping Screw. Specification : - To Is 7169:2018, Iso 1483:2011(second Revision)- St 4.8 X 19 - St - C. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2024-12-23
India Construction Of Viaduct (4.7 Km), Retaining Walls, Embankment And Minor Bridges For Proposed Up And Down Line To Provide Permanent Mitigation Measures In Elephant Corridors Near Deepor Beel Area, Including Track Work, Ohe Work, Modification Of Azara Ssp A 2024-12-23
Oman Maintenance Of Pumps Room At Al Qurum Natural Park 2024-12-23
-Guide-Profile-With-Key-2000-Mm-Long.-As-Per-Clw-Drg.-No.-01/3/44/52-Ref-5-Alt-10-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Nor>India -Guide-Profile-With-Key-2000-Mm-Long.-As-Per-Clw-Drg.-No.-01/3/44/52-Ref-5-Alt-10-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Nor>Supply Of Guide Profile With Key 2000 Mm Long
Guide Profile With Key 2000 Mm Long. As Per Clw Drg. No. 01/3/44/52 Ref-5 Alt-10 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Nor
-Guide-Profile-With-Key-2000-Mm-Long.-As-Per-Clw-Drg.-No.-01/3/44/52-Ref-5-Alt-10-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Nor>2024-12-23
Japan Manufacturing Of A Small Fatigue Test Device: 1 Set 2024-12-23
Oman Hvac System Works - Shafa 2024-12-23
Whats app