Filter Search


Asia


Location Summary Deadline
India Hyd. Pressure Hose 1/2"(8 No.) .#* Hyd. Pressure Hose No. 8 Sae 100 R2 With Maximum Working Pressure 276 Bar And Minimu m Bursting Pressure 1103 Bar. Running Length-each In 25 Mtrs. Of Length. Acceptable Make/brand: Parke r, Aeroquip,polyhose,premier Rubb 2025-11-26
Saudi Arabia Management And Operation Of A Warehouse On Abdul Rahman Bin Auf Road 2025-11-26
India Tender Invited For Laptop. 2025-11-26
Japan 1) Purchase Two Snow Removal Graders (4.0m Grade) Exchanged; 2) Purchase One Snow Removal Graders (4.3m Grade) Exchanged (projects Covered By Electronic Procurement System) 2025-11-26
Saudi Arabia Management, Operation And Maintenance Of A Building Materials Site On Prince Faisal Bin Bandar Road 2025-11-26
India Support .#* Support As Per Drg.no. 9534177 Alt Ee Specn: Purchase Spec.no.misc:248 [ Warranty Period: 3 0 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 L acs ] ] 2025-11-26
India Auction Sale Of Property[38861] / Residential Plot No A-85 Vigyan Nagar Yojana, Jodhpur 2025-11-27
India Hex Nut (ms) M12 To Is: 1364/2002 (pt-3) P.c.-4 Zinc Plated. .#* Hex Nut (ms) M12 To Is: 1364/2002 (pt-3) P.c.-4 Zinc Plated. [ Warranty Period: 30 Mont hs After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po 2025-11-27
India Slide Switch Gen. .#* Slide Switch Gen. Field To Emd Drg. No.8481166 Rev. "b" (blw Part.no.18310485), Bl w Drg.no.8488387 Alt. "gc" Or Latest Till The Closing Date Of Tender. [ Warranty Period: 30 Months After the Date Of Delivery ] [quantity Tolerance (+ 2025-11-27
Thailand The Project Involves The Expansion Of The Electrical Distribution System In The Area Of Nong Bu, Sam Phrao, Mueang District, Udon Thani. The Scope Includes Excavation And Installation Of Poles, Concrete Work, Assembly Of Grounding Systems, Installation Of 2025-11-27
Whats app