Filter Search


Asia


Location Summary Deadline
Nepal Supply And Delivery Of Ict Tools, Sundarharaicha 2026-02-05
India A) Construction Of Rcc Drains At Various Locations In Yedshi To Aurangabad Section And(b)strengthening Of Service Roads With White Topping, Construction Of Entry/exit Ramps And Drain And Culvert Works In Aurangabad To Karodi Section Of Nh52 On Epc 2026-02-05
India Supply Of Medicine 2026-02-05
India Providing Internal Road (white Topping) In Front Of Main College Building In The Premises Of Kmcri Campus, Hubballi Taluk, Dharwad District. 2026-02-05
India Construction Of The Block And Sector Office Building Including Electrification Work. 2026-02-05
Bangladesh Improvement Of Road, Rcc Pipe & Footpath At Chandrima Uddan Avenue-2 Chandrima Main Road To Turag River At Ward 33, Zone-5 Of Dncc. 2026-02-05
India Roof Line Insulator .#* Roof Line Insulator Cat.no.p/1/0141a C & D No. T016/559. Clw Spec. No. Clw/es/ac/i-1/k, clw/es/sk-2/ac/i-1/k [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Tot 2026-02-05
India Swachata , Electircal , Bhavan Nirman And Repering Karya Hetu Samgri 2026-02-05
Nepal Gairigaun Syalagud Tadhakhola Irrigation And Drainage, Tarakeshwor Ward-3, Nuwakot 2026-02-05
India Single Core Cable 4 Gkw 1800v- Bk To Clws Spec.no.-clw/es/3/0458(alt.- e).size:4gkwa X70.0 Sq.mm. .#* Single Core Cable 4 Gkw 1800v- Bk To Clws Spec.no.-clw/es/3/0458(alt.-e).size:4gkw a X70.0 Sq.mm. [ Warranty Period: 20 Months After The Date Of Delivery 2026-02-05
Whats app