Filter Search


Asia


Location Summary Deadline
India Auction Sale Of Plot No.74/b, Admeasuring 100.59 Sq.mts*#. Immovable Property Being Land Of Open Plots Being Plot No.74/b, Admeasuring 100.59 Sq.mts. "b-type" In The Scheme Of Plots Known As "shiv Puja Residency" With Road And C.o.p. Land Admeasuring 15.0 2025-10-13
India Construction Of Satellite Hospital Building At Jhotwara Distt. Jaipur (including Internal Electrification Work) (state Head 24-25) 2025-10-13
India Request For Expression Of Interest For Empanelment Of Agencies For Carrying Out Hydrographic (bathymetry And Geophysical Survey) And Topographical Survey In Ports, Harbour And Waterways Sector. 2025-10-13
India Developing And Maintaining Garden And Lawn In Both Side Of Road Between Gate No 5 To Power House Building Of Rihand Hydro Power Station, Pipri, Sonebhadra For Two Years 2025-10-13
India Tender Invited For Led Based Indicating Lamp For Panel Cut Outs (q2)##quantity: 270## 2025-10-13
Turkey Equipment And Materials Will Be Purchased 2025-10-13
-Tender-No-Ls11---2025-Allotment-Of-Land-Through-Etender-Cum-Eauction>India -Tender-No-Ls11---2025-Allotment-Of-Land-Through-Etender-Cum-Eauction>Tender No. Ls-11-2025 – allotment Of Land Through E-tender Cum E-auction For The Purpose Of Manufacturing And Supply Of Green Methanol On 30 Years Lease On As Is Where Is Basis
Tender No Ls11 - 2025 Allotment Of Land Through Etender Cum Eauction
-Tender-No-Ls11---2025-Allotment-Of-Land-Through-Etender-Cum-Eauction>2025-10-13
India Tender Called For The Allotment Of Surathkal Bus Stand Commercial Complex Shop No-8 At Ground Floor On Monthly Rental Basis (reserved For Scheduled Tribe (st) 2025-10-13
India Trough Floor To Icf Drg. No. Scn-3-1-3-315 Alt-e/3, Item No.1. .#* Trough Floor To Icf Drg. No. Scn-3-1-3-315 Alt-e/3, Item No.1.without Holes. Matl.&spec. As per Irsm-41/97. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+ 2025-10-13
India Proposed Shopping Complex At Rashin Sub Yard For A.p.m.c Karjat Dist Ahmadnagar Ground Flour Phase 2 2025-10-13
Whats app