Filter Search


Asia


Location Summary Deadline
Bangladesh Construction Of Custom House Chattogram 2026-01-21
Saudi Arabia Construction, Operation, And Maintenance Of A Bowling Alley In King Fahd Park 2026-01-21
Japan Charge Fff (field Flow Fractionation) Device Set 2026-01-21
India Rubber Kit For 1.1/4" Cut-off Angle Cock With Vent .#* Rubber Kit For 1.1/4" Cut-off Angle Cock With Vent As Per Clw Drg. No. 0/2/65/386 Alt. 6, Re f-12 & 13 (02 Items 03 Nos.) Consisting (i) 0 Ring (ref-12) 01 No. (ii) Sealing Washer (ref.-13)-02 Nos. (t 2026-01-21
Nepal Construction Work Bid Invitation 2026-01-21
-Hiring-Of-1-No-60t-Bollard-Pull-Capacity-Electric-Green-Tug>India -Hiring-Of-1-No-60t-Bollard-Pull-Capacity-Electric-Green-Tug>Md/green Tug Transition/2025
Hiring Of 1 No 60t Bollard Pull Capacity Electric Green Tug
-Hiring-Of-1-No-60t-Bollard-Pull-Capacity-Electric-Green-Tug>2026-01-21
Japan Communication Equipment For Patrol Vessel Multipurpose 1 Set And Other 17 Items. 2026-01-21
India Auction Sale Of Property[39842] / Auction Date - 20.11.2025 To 29.01.2026 , Bakra Mandi ,rjajr1/1122/008027h , Property Number 122 2026-01-21
Saudi Arabia Construction, Operation, And Maintenance Of A Mixed-use Commercial And Residential complex On Abu Bakr Al-siddiq Road In Al-faisaliyah 2026-01-21
Lebanon The Purpose Of This Deal Is To Repair The Power Transformer 20-220/15 Kv - 70 Mva. The Return For Halat Station Is As Described In The Terms Of Reference Of The Special Conditions Book. The Time Period Required To Complete The Task Is A Maximum Of 10 Mont 2026-01-21
Whats app