Filter Search


Asia


Location Summary Deadline
India Stopper Assembly .#* Stopper Assembly For Transverse Back-rest Of Accn Coach As Per Drg No. Ae61468 Alt.b Or Latest. [ Warranty Period: 30 Months After The Da te Of Delivery ] ] 2025-10-14
India Setting Up Of Integrated Seed Processing Plant At Bijoynagar, Under Mohanpur Agri Sub-div. Sh Providing Internal Electrification 2025-10-14
India Design, Construction, Furnishing & Equipping Of Third Vertical Shaft On Turnkey Basis At Chikla Mine Of Moil Ltd., Tumsar Tehsil, Dist. - Bhandara, Maharashtra, India. The Work Is Estimated To Cost Inr 208.17 Crore Plus Gst As Applicable. The Works Are Re 2025-10-14
Nepal Procurement Of Office Supplies And Stationary Items 2025-10-14
Saudi Arabia Establishing, Operating And Maintaining Commercial Stores On Piece No. (kh7) In Plan No. (189-1) In The Tiba Neighborhood Of West Dammam Municipality 2025-10-14
Japan Construction Of The Apartment Building At Takenotsuka 3rd Housing Complex, And Other Urban Development In The 1st Phase Project 2025-10-14
India Auction Sale Of Property[38733] / Auction Date - 11.09.2025 To 30.10.2025 , Transport Nagar , Rjajr1/1015/000485h , 157 2025-10-14
India Suspension Hanger Pin Along With Split Cotter, As Per Scope Of Drawing, suitable For 4.5 Kw Alternator Transom Mounted, As Per Rdso Drawing no. Skel-3939 Alteration No.2 .#* Suspension Hanger Pin Along With Split Cotter, As Per Scope Of Drawing, Suita ble 2025-10-14
India Spindle For Hand Brake For Box-n-wagon .#* Spindle For Hand Brake For Box-n-wagon To Rdsos Drg No Wd-80007- S-19, Alt-18, Ite m No- 1. Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of D elivery ] [quantity Toleranc 2025-10-14
Bangladesh Re-construction Of Dc Food Office 3rd Floor With Ancillary Facilities At Pabna 2025-10-14
Whats app