Filter Search


Asia


Location Summary Deadline
India V-belt Size C-114 Conforming. Drawing No: - N/a Spec. No : - Is : 2494 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2024-12-18
Japan Head Office Building Document Receipt And Delivery Service 2024-12-18
India Developing, Operating And Maintaining Of Wayside Amenities On Nh-16, Nh-363 And Nh-150a Various Sections On Lease Basis 2024-12-18
qty:1
>India
qty:1
>Supply Of Gas Engine Driven Horizontal Piston Type Reciprocating Pump
qty:1
qty:1
>2024-12-18
Sri Lanka Supply And Delivery Of Sf6 Gas Analyzer For Ce(sc&m) P&hm-dd2 2024-12-18
Sri Lanka Supply & Delivery Of Circuit Breaker Moulded Case (without Enclosure) 30a - 4, 500 Nos., 60a - 2, 800 Nos. And 1, 600a - 20 Nos 2024-12-18
Japan Electricity To Use In Aist Shikoku 1 Set 2024-12-18
-Cylinder-Head-High-Pressure-For-Gd-Make-Water-Cooled-Air-Compressor,-Model-No.-Wlna9bb-To-Gd-Part.-No.-3wbe7/emd-Part.-No.-8347435.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>India -Cylinder-Head-High-Pressure-For-Gd-Make-Water-Cooled-Air-Compressor,-Model-No.-Wlna9bb-To-Gd-Part.-No.-3wbe7/emd-Part.-No.-8347435.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>Supply Of Cylinder Head High Pressure
Cylinder Head High Pressure For Gd Make Water Cooled Air Compressor, Model No. Wlna9bb To Gd Part. No. 3wbe7/emd Part. No. 8347435. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+
-Cylinder-Head-High-Pressure-For-Gd-Make-Water-Cooled-Air-Compressor,-Model-No.-Wlna9bb-To-Gd-Part.-No.-3wbe7/emd-Part.-No.-8347435.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+>2024-12-18
India Provision Of Integrated Watch Towers With Guard Rest Room And Provision Of Guard Rest Room For Dsc Guard Post At Af Station Palam 2024-12-18
-Transportation-Of-Silt.-
-Repair-&-Painting-In-Ground-Floor-Of-Borough-Xv-Office-Main-Building.-
-Repair-&-Renovation-Of-Labour-Quarter-Shed-No-07.>India
-Transportation-Of-Silt.-
-Repair-&-Painting-In-Ground-Floor-Of-Borough-Xv-Office-Main-Building.-
-Repair-&-Renovation-Of-Labour-Quarter-Shed-No-07.>Improvement Of Sewer Line From 22b Dl Roy Street.
Transportation Of Silt.
Repair & Painting In Ground Floor Of Borough Xv Office Main Building.
Repair & Renovation Of Labour Quarter Shed No 07.
-Transportation-Of-Silt.-
-Repair-&-Painting-In-Ground-Floor-Of-Borough-Xv-Office-Main-Building.-
-Repair-&-Renovation-Of-Labour-Quarter-Shed-No-07.>2024-12-18
Whats app