Filter Search


Asia


Location Summary Deadline
India Supply Of Hand Rail Assembly For 3-phase Loco Fixing Clamps As Per Els/lgd Drg. No. C/els/lgd/b.f/3/37 Ref Nos. 02, 03 & 06 As Follows. 1) Ref No. 2 : Base Plate. Qty/set. = 06 Nos. 2) Ref No. 3 : Top Plate. Qty/set. = 02 Nos. 3) Ref No. 6 : Hex. Head Bol 2024-12-11
Korea Republic of Reusable Battery Module Diagnostic Evaluation System 2024-12-11
-Friction-Arm-[l.h]for-Wag7-Loco-To-Clws-Drg.no.06/3/19/117-Alt.1.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8>India -Friction-Arm-[l.h]for-Wag7-Loco-To-Clws-Drg.no.06/3/19/117-Alt.1.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8>Supply Of Friction Arm
Friction Arm [l.h]for Wag7 Loco To Clws Drg.no.06/3/19/117 Alt.1. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8
-Friction-Arm-[l.h]for-Wag7-Loco-To-Clws-Drg.no.06/3/19/117-Alt.1.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8>2024-12-11
India Resurfacing To Roads Of Devbhumi Dwarka District Package No.rpc-1/dwrk/sr/2023-24/bhnvd/p.02 Ta. , Dist.; Devnhumi Dwarka. 2024-12-11
-Design,-Engineering,-Manufacturing,-Supply,-Installation-&-Commissioning-For-Complete-Conversion-Of-Existing-Auto>India -Design,-Engineering,-Manufacturing,-Supply,-Installation-&-Commissioning-For-Complete-Conversion-Of-Existing-Auto>Design, Engineering, Supply, Testing, Erection & Commissioning Of Complete Prds Control Valve & Complete De Superheating Control Valve.
Design, Engineering, Manufacturing, Supply, Installation & Commissioning For Complete Conversion Of Existing Auto
-Design,-Engineering,-Manufacturing,-Supply,-Installation-&-Commissioning-For-Complete-Conversion-Of-Existing-Auto>2024-12-11
-Work>India -Work>Ward No 13 Keshav Nagar Me 24 Nag Naye Handpump Adhisthapan Ka Karya
Work
-Work>2024-12-11
Turkey Personnel Service Will Be Received 2024-12-11
India Ward Number 2 Mein Avadh Green Garden Se Shyam Shrivtastav Ke Makan Hote Hue Seva Bharati School Tak And Royal College Se Etawah Hotel Tak Nala Nirman Work 2024-12-11
India Improvement Of Various Roads Of Taluka Under Kishanpath Yojana Pkg No. Dwk/kishanpath/khmbl/23-24/p04 Ta., Dist. Devbhumi Dwarka 2024-12-11
Tajikistan Community Development Officer; Dai Global / Usaid Resilient Communities Activity (rca) 2024-12-11
Whats app