Filter Search


Asia


Location Summary Deadline
India Supply Of Calcium Polystyrene Sulfonate Sachets 15 Gm Atleast[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] 2024-12-13
India Supply Of Base Door Assembly To Blw Part No.10021255 With Drg. No.ske-0568 Alt.b And Drp No.11434 F/27 Along With Relevant Part Drawings. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , 2024-12-13
India Auction Sale Of Immovable Property- Plot On As Is Where Is Basis, As Is What Is Basis, Whatever There Is Basis. 2024-12-13
Sri Lanka Repairing Of All Vehicles And Machinery Including Motor Cars, Tractors And Trailers 2024-12-13
-Running-Operation-And-Guarding-Of-The-Pumping-Machinery-And-Electrical-Installation-At-Over-Head-Reservoir-Site-Pump-House-Under-Joypur-W/s-Scheme-With-Relevant-Gram-Panchayats-Under-Purulia-Mechanical-Division-Phe.>India -Running-Operation-And-Guarding-Of-The-Pumping-Machinery-And-Electrical-Installation-At-Over-Head-Reservoir-Site-Pump-House-Under-Joypur-W/s-Scheme-With-Relevant-Gram-Panchayats-Under-Purulia-Mechanical-Division-Phe.>12 /ee/pmd/phed Of 2024-2025/sl19
Running Operation And Guarding Of The Pumping Machinery And Electrical Installation At Over Head Reservoir Site Pump House Under Joypur W/s Scheme With Relevant Gram Panchayats Under Purulia Mechanical Division Phe.
-Running-Operation-And-Guarding-Of-The-Pumping-Machinery-And-Electrical-Installation-At-Over-Head-Reservoir-Site-Pump-House-Under-Joypur-W/s-Scheme-With-Relevant-Gram-Panchayats-Under-Purulia-Mechanical-Division-Phe.>2024-12-13
Saudi Arabia Project To Establish Sports Facilities And A Lounge In The First Residential Group In King Fahad Medical City 2024-12-13
Nepal Mahabidhyajan Ma.bi. Aabasiye Bidhyala Purbadhar Nirman,ba.na.pa.-11,baglung 2024-12-13
Nepal Construction Bids Invitation 2024-12-13
Sri Lanka Electrical And Electronic Accessories And Electrical Equipment (including Street Lamps And Accessories) 2024-12-13
-Bogie-End-Pull-Rod-For-Casnub-Bogie-To-Rdso's-Sk.--69597.-Item-No.-2,-Alt.no.-43-(forty-Three).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Bogie-End-Pull-Rod-For-Casnub-Bogie-To-Rdso's-Sk.--69597.-Item-No.-2,-Alt.no.-43-(forty-Three).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Bogie End Pull Rod Etc.
Bogie End Pull Rod For Casnub Bogie To Rdso's Sk.- 69597. Item No.-2, Alt.no.-43 (forty Three). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Bogie-End-Pull-Rod-For-Casnub-Bogie-To-Rdso's-Sk.--69597.-Item-No.-2,-Alt.no.-43-(forty-Three).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-12-13
Whats app