Filter Search


Asia


Location Summary Deadline
-High-Speed-Steel-High-Cobalt-Contant-Drill-Bit-6.3-Mm-As-Per-Drg.no.-Din-338,-Other-Details-As-Per-Enclosed-Annexure--Mp/spec--01/12-Dated--07.11.2012.to-Be-Purchased-From-Oem,or-The-Authorized-Dealers>India -High-Speed-Steel-High-Cobalt-Contant-Drill-Bit-6.3-Mm-As-Per-Drg.no.-Din-338,-Other-Details-As-Per-Enclosed-Annexure--Mp/spec--01/12-Dated--07.11.2012.to-Be-Purchased-From-Oem,or-The-Authorized-Dealers>Supply Of High Speed Steel High Cobalt Contant
High Speed Steel High Cobalt Contant Drill Bit 6.3 Mm As Per Drg.no. Din 338, Other Details As Per Enclosed Annexure- Mp/spec- 01/12 Dated- 07.11.2012.to Be Purchased From Oem,or The Authorized Dealers
-High-Speed-Steel-High-Cobalt-Contant-Drill-Bit-6.3-Mm-As-Per-Drg.no.-Din-338,-Other-Details-As-Per-Enclosed-Annexure--Mp/spec--01/12-Dated--07.11.2012.to-Be-Purchased-From-Oem,or-The-Authorized-Dealers>2024-12-16
Tajikistan Procurement Of Computer And Server Equipment For The Informational Analytical Center Of Mhspp 2024-12-16
India Replacement Of Defective Cable, Outlived Leds & Re-alignment/straightening Of Location Boxes Over Division Of West Central Railways (signalling Work) 2024-12-16
-Set-Of-Compensating-Plate-For-Secondary-Suspension-Spring-Of-Wap--7-As-Per-Following-Details.-(1)compensating-Plate-Thickness-3mm-As-Per-Sr.dee/rs/gzb-Drg-No.311/3-phase/2>India -Set-Of-Compensating-Plate-For-Secondary-Suspension-Spring-Of-Wap--7-As-Per-Following-Details.-(1)compensating-Plate-Thickness-3mm-As-Per-Sr.dee/rs/gzb-Drg-No.311/3-phase/2>Supply Of Set Of Compensating Plate For Secondary Suspension Spring Of Wap- 7
Set Of Compensating Plate For Secondary Suspension Spring Of Wap- 7 As Per Following Details. (1)compensating Plate Thickness 3mm As Per Sr.dee/rs/gzb Drg No.311/3-phase/2
-Set-Of-Compensating-Plate-For-Secondary-Suspension-Spring-Of-Wap--7-As-Per-Following-Details.-(1)compensating-Plate-Thickness-3mm-As-Per-Sr.dee/rs/gzb-Drg-No.311/3-phase/2>2024-12-16
-Inter-Vehicle-Coupler-Z.s.-Coupling-400-Amp,-750-Volt,-3-Phase,-50-Hz-Complete-With-Terminating-Cable-Sockets-At-Junction-Box-End,-As-Per-Rcf-Spec.no-Edts-105,-Rev-e-With-Amndt-1,-2-And-3-Or-Latest,-Suitable-For-Lhb-T>India -Inter-Vehicle-Coupler-Z.s.-Coupling-400-Amp,-750-Volt,-3-Phase,-50-Hz-Complete-With-Terminating-Cable-Sockets-At-Junction-Box-End,-As-Per-Rcf-Spec.no-Edts-105,-Rev-e-With-Amndt-1,-2-And-3-Or-Latest,-Suitable-For-Lhb-T>Supply Of Inter Vehicle Coupler
Inter Vehicle Coupler Z.s. Coupling 400 Amp, 750 Volt, 3 Phase, 50 Hz Complete With Terminating Cable Sockets At Junction Box End, As Per Rcf Spec.no Edts-105, Rev-e With Amndt 1, 2 And 3 Or Latest, Suitable For Lhb T
-Inter-Vehicle-Coupler-Z.s.-Coupling-400-Amp,-750-Volt,-3-Phase,-50-Hz-Complete-With-Terminating-Cable-Sockets-At-Junction-Box-End,-As-Per-Rcf-Spec.no-Edts-105,-Rev-e-With-Amndt-1,-2-And-3-Or-Latest,-Suitable-For-Lhb-T>2024-12-16
Sri Lanka Storm Water Disposal And Land Drainage 2024-12-16
Sri Lanka Tyres, Tubes, Batteries 2024-12-16
-Construction-Of-New-Main-Pumping-Station-Ay-Kumbharwada-Including-Augmentation-Of-Nearby-Lift-Pumping-Station.-
-Civil-Works-Under-Various-Grant.>India
-Construction-Of-New-Main-Pumping-Station-Ay-Kumbharwada-Including-Augmentation-Of-Nearby-Lift-Pumping-Station.-
-Civil-Works-Under-Various-Grant.>Providing Of Fire Safety Facility For Various Nagarpalika Buildings.
Construction Of New Main Pumping Station Ay Kumbharwada Including Augmentation Of Nearby Lift Pumping Station.
Civil Works Under Various Grant.
-Construction-Of-New-Main-Pumping-Station-Ay-Kumbharwada-Including-Augmentation-Of-Nearby-Lift-Pumping-Station.-
-Civil-Works-Under-Various-Grant.>2024-12-16
India Procurement Of Mig-29 Aircraft Spares 2024-12-16
Sri Lanka Motor Spare Parts & Lubricants 2024-12-16
Whats app