Filter Search


Asia


Location Summary Deadline
-Supply-Delivery-Erection-Testing-And-Commissioning-Of-Wall-Mounted-3-Star-Bee-Rating-Non-Inverter-Type-Split-Ac-Machines-Full-Copper-For-Condenser-Evaporator-Unit-Having-Capacity-6-Nos-2-0-Tr-In-The-Battery-Room-A>India -Supply-Delivery-Erection-Testing-And-Commissioning-Of-Wall-Mounted-3-Star-Bee-Rating-Non-Inverter-Type-Split-Ac-Machines-Full-Copper-For-Condenser-Evaporator-Unit-Having-Capacity-6-Nos-2-0-Tr-In-The-Battery-Room-A>Wbsetcl/kgp 400kv Ao/e-tender(e)/06
Supply Delivery Erection Testing And Commissioning Of Wall Mounted 3 Star Bee Rating Non Inverter Type Split Ac Machines Full Copper For Condenser Evaporator Unit Having Capacity 6 Nos 2 0 Tr In The Battery Room A
-Supply-Delivery-Erection-Testing-And-Commissioning-Of-Wall-Mounted-3-Star-Bee-Rating-Non-Inverter-Type-Split-Ac-Machines-Full-Copper-For-Condenser-Evaporator-Unit-Having-Capacity-6-Nos-2-0-Tr-In-The-Battery-Room-A>2024-12-09
-Qty-:-1
>India
-Qty-:-1
>Bid For - Design Class Approval Manufacturing Testing Commissioning Supply Of Pontoons
Qty : 1
-Qty-:-1
>2024-12-09
India Replacement Of Old Damaged Door Shutter Of 38/ii And A5/i Sikanderpur And Qtrs. No 13/iii Colony No 2 Regarding 2024-12-09
-Mogra-sultangacha-Road-From-2-Km-To-5-Km,-Restoration-Work-Due-To-The-Cause-Of-Damage-For-Underground-Water-Supply-Pipeline-Layout-Executed-By-Public-Health-Engineering-Directorate-Within-Polba--Dadpur-And-Mogra-Block-U>India -Mogra-sultangacha-Road-From-2-Km-To-5-Km,-Restoration-Work-Due-To-The-Cause-Of-Damage-For-Underground-Water-Supply-Pipeline-Layout-Executed-By-Public-Health-Engineering-Directorate-Within-Polba--Dadpur-And-Mogra-Block-U>Wbpwrd/se/whc-ii/nit_02/24-25
Mogra-sultangacha Road From 2 Km To 5 Km, Restoration Work Due To The Cause Of Damage For Underground Water Supply Pipeline Layout Executed By Public Health Engineering Directorate Within Polba- Dadpur And Mogra Block U
-Mogra-sultangacha-Road-From-2-Km-To-5-Km,-Restoration-Work-Due-To-The-Cause-Of-Damage-For-Underground-Water-Supply-Pipeline-Layout-Executed-By-Public-Health-Engineering-Directorate-Within-Polba--Dadpur-And-Mogra-Block-U>2024-12-09
-Construction-Work>India -Construction-Work>Nagar Panchayat Khimsepur Me Maharana Pratap Nagar Me Vinod Ke Ghar Se Raghvendra Ke Ghar Tak Cc Road Avam Nali Nirman Karya
Construction Work
-Construction-Work>2024-12-09
India Mumbai Central - Electrical (power) Work In Connection With Repairs And Renovation At 4th Floor Finance Department In Annex Building. 2024-12-09
-Supply-Of-One-No.-Of-Multipurpose-Fire-Tender-And-One-No.-Of-Dcp-Fire-Tender-For-Ptpp-Parichha>India -Supply-Of-One-No.-Of-Multipurpose-Fire-Tender-And-One-No.-Of-Dcp-Fire-Tender-For-Ptpp-Parichha>Supply Of Dcp And Multipurpose Fire Tenders
Supply Of One No. Of Multipurpose Fire Tender And One No. Of Dcp Fire Tender For Ptpp Parichha
-Supply-Of-One-No.-Of-Multipurpose-Fire-Tender-And-One-No.-Of-Dcp-Fire-Tender-For-Ptpp-Parichha>2024-12-09
India Supply Of 727 Nos. 33 Kv Bus Isolator (800a). 2024-12-09
India Updation Of Dpr For Nw-4. 2024-12-09
India Interconnection Of 33 Kv Line From 33/11 Kv S/stn. Chiphi To 33/11 Kv S/stn. Jhalmala Under (o&m) Dn. Pandariya. 2024-12-09
Whats app