Filter Search


Asia


Location Summary Deadline
Sri Lanka Solar Panel Systems And Equipment 2024-12-10
India Provision Of Drinking Water Facility And Augmentation To Existing Facilities At Various Level Crossings Under Sr.den-iv-mb. Chargeable To Estimate No. 76/2024 (sf). 2024-12-10
Turkey Surgical Sutures And Consumables Will Be Purchased 2024-12-10
India Supply Of Control Rod Head For Irsa-600 Type Slack Adjuster To Rdso Drg. No. Wd-82064-s-05-rc, Alt. No.7, Item No.2 Other Technical Requirements Conforming To Rdso Specification No. 07-abr-1992, Read With All Amendments. Last Amendment No. 5 Of Sept-2016. 2024-12-10
India Construction Of Cast-in-situ Box Tunnel In Rock Falling Location In Between Ch. 7.660 Km To Ch. 7.890 Km From Hansdiha And Making Suitable Diversion Line In Connection With New Bg Line Between Hansdiha And Godda. 2024-12-10
-Hand-Held-Off-Track-Tamper(goods,-Light-Weight-Lithiumbattery-Tamping-Machine-One-Set-Containing-2nos-Of-Tampers).-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>India -Hand-Held-Off-Track-Tamper(goods,-Light-Weight-Lithiumbattery-Tamping-Machine-One-Set-Containing-2nos-Of-Tampers).-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>Supply Of Hand Held Off Track Tamper
Hand Held Off Track Tamper(goods, Light Weight Lithiumbattery Tamping Machine One Set Containing 2nos Of Tampers). [ Warranty Period: 12 Months After The Date Of Delivery ] ]
-Hand-Held-Off-Track-Tamper(goods,-Light-Weight-Lithiumbattery-Tamping-Machine-One-Set-Containing-2nos-Of-Tampers).-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]>2024-12-10
-Clamp-For-1/2-Inch-Nb-Ms-Pipe-To-Dlw-Drg.-No.-Tpl-0010-Alt-d.-]>India -Clamp-For-1/2-Inch-Nb-Ms-Pipe-To-Dlw-Drg.-No.-Tpl-0010-Alt-d.-]>Supply Of Clamp For 1/2 Inch Nb Ms Pipe
Clamp For 1/2 Inch Nb Ms Pipe To Dlw Drg. No. Tpl-0010 Alt-d. ]
-Clamp-For-1/2-Inch-Nb-Ms-Pipe-To-Dlw-Drg.-No.-Tpl-0010-Alt-d.-]>2024-12-10
India Auction Sale Of Ql Plot No 219 Ame Balesar Kui Jodha Balesar Sandstone 2024-12-10
India Assessment Of Ground Borne Vibrations To Establish A Criterion Of Design Of Track-form System For Vibration Mitigation Measures For Line-10 Of Phase – Iv Corridor 2024-12-10
Thailand Hire A Contractor To Prune Tree Branches On A One-time Basis According To The 6-7th Project Plan, No. 2/2024 Of The Provincial Electricity Authority, Li Branch, By Specific Methods. 2024-12-10
Whats app