Filter Search


Asia


Location Summary Deadline
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-And-Iep-Of-Kaluari-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>India -Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-And-Iep-Of-Kaluari-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>Wbphed/ee/md/niet_41 Of 2025-2026, Sl. No. 14
Annual Operation Maintenance And Emergent Repair Of Pipe Line Of Distribution System Rising Main And Iep Of Kaluari Piped Water Supply Scheme At Old Malda Dev. Block Under Malda Division, Phe Dte. In The
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-And-Iep-Of-Kaluari-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>2026-01-27
-Annual-Operation-Maintenance-Of-2-Nos-Iep-Pressure-Type-Of-Bahirgachhi-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Capacity-40.00-Cum-Hr.-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.-Pe>India -Annual-Operation-Maintenance-Of-2-Nos-Iep-Pressure-Type-Of-Bahirgachhi-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Capacity-40.00-Cum-Hr.-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.-Pe>Wbphed/ee/md/niet_41 Of 2025-2026, Sl. No. 15
Annual Operation Maintenance Of 2 Nos Iep Pressure Type Of Bahirgachhi Piped Water Supply Scheme At Old Malda Dev. Block Capacity 40.00 Cum Hr. Under Malda Division, Phe Dte. In The District Of Malda. Pe
-Annual-Operation-Maintenance-Of-2-Nos-Iep-Pressure-Type-Of-Bahirgachhi-Piped-Water-Supply-Scheme-At-Old-Malda-Dev.-Block-Capacity-40.00-Cum-Hr.-Under-Malda-Division,-Phe-Dte.-In-The-District-Of-Malda.-Pe>2026-01-27
India Draw Hook Beam Reinforced For Draw Gear Arrg To Icf Drg No.t-2-1-602 alt M/2, Item No. 1,2,3&4. .#* Draw Hook Beam Reinforced For Draw Gear Arrg To Icf Drg No.t-2-1-602 Alt M/ 2, Item No. 1,2,3&4. [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-01-27
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Sultannagar-Piped-Water-Supply-Scheme-At-H.-C.-Pur-ii-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>India -Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Sultannagar-Piped-Water-Supply-Scheme-At-H.-C.-Pur-ii-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>Wbphed/ee/md/niet_41 Of 2025-2026, Sl. No. 05
Annual Operation Maintenance And Emergent Repair Of Pipe Line Of Distribution System Rising Main Of Sultannagar Piped Water Supply Scheme At H. C. Pur-ii Dev. Block Under Malda Division, Phe Dte. In The
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Sultannagar-Piped-Water-Supply-Scheme-At-H.-C.-Pur-ii-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The>2026-01-27
India Comprehensive Annual Maintenance Contract For Electronic Interlocking System Of m/s Westrace At Lower Parel, Mahim, Malad, Kandivali For Period Of Three Years Of mumbai Division Western Railways 2026-01-27
India Nrl-mae:- A) Provision Of Anti Crash Barrier (4100 M) B) Provision Of Canadian fencing (150 M). C) Provision Of Boulder Netting & Rock Bolting (20mt). 2026-01-27
India Lubrication Of Curves Using Contractors Own Track Based Rail Gauge Face lubricator (electronic Type) - 47 Nos In The Jurisdiction Of Sr.den/i/mb.(estimate No. 67/2024)(rrsk/sf) 2026-01-27
India Provision Of 225 Kl Rcc Oht And Other Associated Work Like Boring Of Tubewell, laying Of Pipeline Etc. For Improvement Of Water Supply In Colonies In Lieu Of existing Steel Tank At Rwl In The Jurisdiction Of Sr.den/i/mb. (est. No. 35/2025 capital) 2026-01-27
India Provision Of 225 Kl Rcc Oht With Plumbing Pipe, Pump House With Bore In Lieu Of steel Tank At Hw In The Jurisdiction Of Aden/hw. (est. No. 36/2025 Capital) 2026-01-27
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Rajaramchak-Piped-Water-Supply-Scheme-At-Gazole-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The-Distri>India -Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Rajaramchak-Piped-Water-Supply-Scheme-At-Gazole-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The-Distri>Wbphed/ee/md/niet_41 Of 2025-2026, Sl. No. 06
Annual Operation Maintenance And Emergent Repair Of Pipe Line Of Distribution System Rising Main Of Rajaramchak Piped Water Supply Scheme At Gazole Dev. Block Under Malda Division, Phe Dte. In The Distri
-Annual-Operation-Maintenance-And-Emergent-Repair-Of-Pipe-Line-Of-Distribution-System-Rising-Main-Of-Rajaramchak-Piped-Water-Supply-Scheme-At-Gazole-Dev.-Block-Under-Malda-Division,-Phe-Dte.-In-The-Distri>2026-01-27
Whats app