Filter Search


Asia


Location Summary Deadline
-Kit-Overhauling-To-Piston-Valve-(pveri/-Pvbc)-To-Nyab.pt.no:i/88098/341-Consists-Of-15-Items-As-Per-Annexure-Attached.-[>India -Kit-Overhauling-To-Piston-Valve-(pveri/-Pvbc)-To-Nyab.pt.no:i/88098/341-Consists-Of-15-Items-As-Per-Annexure-Attached.-[>Supply Of Kit Overhauling To Piston Valve (pveri/ Pvbc) To Nyab.pt.no:i/88098/341 Consists Of 15 Items As Per Annexure Attached.
Kit Overhauling To Piston Valve (pveri/ Pvbc) To Nyab.pt.no:i/88098/341 Consists Of 15 Items As Per Annexure Attached. [
-Kit-Overhauling-To-Piston-Valve-(pveri/-Pvbc)-To-Nyab.pt.no:i/88098/341-Consists-Of-15-Items-As-Per-Annexure-Attached.-[>2024-12-10
-Insulin-Human-Rdna-Technology-30/70,-40-Unit/-Ml/vial-Of-10ml.-Make/brands:--M/s-Lupin,-Biocon-Biologics-Limited-nova-Nordisk,-Wockhardt-Etc-Along-With-All-Other-Railway-Board-Approved-Manufacturers.-]>India -Insulin-Human-Rdna-Technology-30/70,-40-Unit/-Ml/vial-Of-10ml.-Make/brands:--M/s-Lupin,-Biocon-Biologics-Limited-nova-Nordisk,-Wockhardt-Etc-Along-With-All-Other-Railway-Board-Approved-Manufacturers.-]>Supply Of Insulin Human Rdna
Insulin Human Rdna Technology 30/70, 40 Unit/ Ml/vial Of 10ml. Make/brands:- M/s Lupin, Biocon Biologics Limited-nova Nordisk, Wockhardt Etc Along With All Other Railway Board Approved Manufacturers. ]
-Insulin-Human-Rdna-Technology-30/70,-40-Unit/-Ml/vial-Of-10ml.-Make/brands:--M/s-Lupin,-Biocon-Biologics-Limited-nova-Nordisk,-Wockhardt-Etc-Along-With-All-Other-Railway-Board-Approved-Manufacturers.-]>2024-12-10
qty:1
>India
qty:1
>Supply Of Ir Temperature Calibrator
qty:1
qty:1
>2024-12-10
qty:1
>India
qty:1
>Supply Of Co2 Incubator
qty:1
qty:1
>2024-12-10
-Dismantling-&-Reinstallation-Of-Existing-Spiral-Conveyor-At-Dmd.-
-Civil-&-Internal-Electrification-Work-For-Ghee-Store.-
-Civil-Works-For-Modification-Of-Scm-Packing-&-Finished-Product-Area>India
-Dismantling-&-Reinstallation-Of-Existing-Spiral-Conveyor-At-Dmd.-
-Civil-&-Internal-Electrification-Work-For-Ghee-Store.-
-Civil-Works-For-Modification-Of-Scm-Packing-&-Finished-Product-Area>Dismantling & Reinstallation Of Puff Panel At Dhd.
Dismantling & Reinstallation Of Existing Spiral Conveyor At Dmd.
Civil & Internal Electrification Work For Ghee Store.
Civil Works For Modification Of Scm Packing & Finished Product Area
-Dismantling-&-Reinstallation-Of-Existing-Spiral-Conveyor-At-Dmd.-
-Civil-&-Internal-Electrification-Work-For-Ghee-Store.-
-Civil-Works-For-Modification-Of-Scm-Packing-&-Finished-Product-Area>2024-12-10
Sri Lanka Absorbable Synthetic Surgical Suture 2024-12-10
India To Hire 01 Skilled And 02 Unskilled Labourers From External Source For Distribution Centre Musra Kala Under Executive Engineer (san./san.) Division, Dongargarh 2024-12-10
Japan Construction Work Of The Kitchen Building For The Kawagoe Juvenile Prison 2024-12-10
-Driver-Seat-And-Pedestal,-Assembly-For-3-phase-Loco-To-Els/lgd-Drg-No.-C/-Els-/lgd-/bf/3/66-Or-Latest-And-As-Per-Spec-No.-Clw/ms/3/021-Alt-9-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>India -Driver-Seat-And-Pedestal,-Assembly-For-3-phase-Loco-To-Els/lgd-Drg-No.-C/-Els-/lgd-/bf/3/66-Or-Latest-And-As-Per-Spec-No.-Clw/ms/3/021-Alt-9-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>Supply Of Driver Seat And Padestal, Assly
Driver Seat And Pedestal, Assembly For 3-phase Loco To Els/lgd Drg No. C/ Els /lgd /bf/3/66 Or Latest And As Per Spec No. Clw/ms/3/021 Alt-9 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery
-Driver-Seat-And-Pedestal,-Assembly-For-3-phase-Loco-To-Els/lgd-Drg-No.-C/-Els-/lgd-/bf/3/66-Or-Latest-And-As-Per-Spec-No.-Clw/ms/3/021-Alt-9-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery>2024-12-10
Saudi Arabia Receiving, Implementing, Planting, Caring For And Protecting Seven Hundred Thousand Wild Seedlings Of Local Trees And Shrubs In Nyal - In... 2024-12-10
Whats app