Filter Search


Asia


Location Summary Deadline
India Piped Water Supply Scheme - Chahchad block- Durgukondal district -kanker vidhan Sabha - Bhanupratappur tender Document 2025-10-09
-Installation-Of-Solar-High-Mast-Light-Near-Khairul-Sk-House-At-Chakta-Village,-Mouza--Chakta,-J.l-No--02,-Under-Ankhona-G.p,-Within-Ketuugram-i-Panchayat-Samity.-(fund---Apas,-2025-26).>India -Installation-Of-Solar-High-Mast-Light-Near-Khairul-Sk-House-At-Chakta-Village,-Mouza--Chakta,-J.l-No--02,-Under-Ankhona-G.p,-Within-Ketuugram-i-Panchayat-Samity.-(fund---Apas,-2025-26).>Construction Of Solar High Mast Light
Installation Of Solar High Mast Light Near Khairul Sk House At Chakta Village, Mouza- Chakta, J.l No- 02, Under Ankhona G.p, Within Ketuugram-i Panchayat Samity. (fund - Apas, 2025-26).
-Installation-Of-Solar-High-Mast-Light-Near-Khairul-Sk-House-At-Chakta-Village,-Mouza--Chakta,-J.l-No--02,-Under-Ankhona-G.p,-Within-Ketuugram-i-Panchayat-Samity.-(fund---Apas,-2025-26).>2025-10-09
Malaysia Design, Supply, Deliver Ex-site, Installation, Testing, Commissioning And Guarantee Kernel Bunker 500mt C/w Conveyors, Outlet Chute Hydraulic System And Others Related Civil And Electrical Works For Besout Palm Oil Mill 2025-10-09
-Establishment-Of-New-33/11kv-Ss-At-Pallavaram-In-Tiruvannamalai-Edc-(electrical-Works)-Under-Turn-Key>India -Establishment-Of-New-33/11kv-Ss-At-Pallavaram-In-Tiruvannamalai-Edc-(electrical-Works)-Under-Turn-Key>Establishment Of New 33/11kv Ss At Pallavaram(electrical Works) Under Turn Key
Establishment Of New 33/11kv Ss At Pallavaram In Tiruvannamalai Edc (electrical Works) Under Turn Key
-Establishment-Of-New-33/11kv-Ss-At-Pallavaram-In-Tiruvannamalai-Edc-(electrical-Works)-Under-Turn-Key>2025-10-09
India Electrical General Work For "completion Of Balance Work Of Extended Station building (ground Floor) At Tak And Dome Structure, The Connection Between The station Building & Pilgrim Shed Including Development Of Front Facade Along With porch, Interior Deve 2025-10-09
India Construction Of 4-lane Thiruvarur Bypass (km 15.900 Km 30.836) In Nagapattinam Thanjavur Section Of Nh83 In Tamil Nadu On Hybrid Annuity Mode (project Length 14.936 Km) 2025-10-09
-Repairing-And-Reinstallation-Of-Existing-Fire-Fighting-System-At-Benfish-Bhawan-31-Gn-Block-Sector-V-Saltlake-City-Kolkata-91-B-Plus-G-Plus-7>India -Repairing-And-Reinstallation-Of-Existing-Fire-Fighting-System-At-Benfish-Bhawan-31-Gn-Block-Sector-V-Saltlake-City-Kolkata-91-B-Plus-G-Plus-7>Benfish/md/niq-02(e)/2025-26/3
Repairing And Reinstallation Of Existing Fire Fighting System At Benfish Bhawan 31 Gn Block Sector V Saltlake City Kolkata 91 B Plus G Plus 7
-Repairing-And-Reinstallation-Of-Existing-Fire-Fighting-System-At-Benfish-Bhawan-31-Gn-Block-Sector-V-Saltlake-City-Kolkata-91-B-Plus-G-Plus-7>2025-10-09
-Retender-For-Cryostat-For-Pathology>India -Retender-For-Cryostat-For-Pathology>Retender For Cryostat For Pathology
Retender For Cryostat For Pathology
-Retender-For-Cryostat-For-Pathology>2025-10-09
Nepal Works Bids Invitation 2025-10-09
India Supply, Installation & Testing Of Application Performance Measuring For Storage devices. .#* Supply, Installation & Testing Of Application Performance Measuring For Storage Devices. [ W rranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-09
Whats app