Filter Search


Asia


Location Summary Deadline
-Construction-Work>India -Construction-Work>Double Axle Tractor Trailer
Construction Work
-Construction-Work>2024-12-09
-M.s.-Bracket-With-Protection-Cover-For-Leveling-Valve-Of-Emu-Coaches-To-Drg.-No.-Cee/cr/emu/mtn/et/rs/4/010.-Rev-r,-Item-No.-3-Only.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months>India -M.s.-Bracket-With-Protection-Cover-For-Leveling-Valve-Of-Emu-Coaches-To-Drg.-No.-Cee/cr/emu/mtn/et/rs/4/010.-Rev-r,-Item-No.-3-Only.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months>Supply Of M.s. Bracket With Protection Cover
M.s. Bracket With Protection Cover For Leveling Valve Of Emu Coaches To Drg. No. Cee/cr/emu/mtn/et/rs/4/010. Rev-r, Item No. 3 Only. Material And Specification As Per Drawing. [ Warranty Period: 30 Months
-M.s.-Bracket-With-Protection-Cover-For-Leveling-Valve-Of-Emu-Coaches-To-Drg.-No.-Cee/cr/emu/mtn/et/rs/4/010.-Rev-r,-Item-No.-3-Only.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months>2024-12-09
India Construction Of Hostel For Working Women At Various Locations. 2024-12-09
India 1) Repair, Renovation And Restoration Of Nangawali Dam And Canal, Tehsil Dungal, District 2024-12-09
-Procurement-Of-Alumina-Castable-Fire-Create-Super-Refractory-Material-For-Bottom-Ash-Hopper-And-Air-Pre-Heater-Duct-Work.>India -Procurement-Of-Alumina-Castable-Fire-Create-Super-Refractory-Material-For-Bottom-Ash-Hopper-And-Air-Pre-Heater-Duct-Work.>Manufacture, Testing & Supply Of Assorted Sizes Of Crusher Hammer Required For Ktps V & Vi.
Procurement Of Alumina Castable Fire Create Super Refractory Material For Bottom Ash Hopper And Air Pre Heater Duct Work.
-Procurement-Of-Alumina-Castable-Fire-Create-Super-Refractory-Material-For-Bottom-Ash-Hopper-And-Air-Pre-Heater-Duct-Work.>2024-12-09
India Manufacture And Supply Of Prestressed Concrete Sleeper For Thick Web Switch Expansionjoint For 60 Kg (uic) Rail To Rdso Drg. No. Rdso/t-8838, With Latest Alternation And Irs Specification T-39 (6th Revision-march-2021), With All Drawings & Specification A 2024-12-09
India Construction Of Entry Gate On Road No. 2 And 40 At I.a. Extension-i. Kosi Kotwan. 2024-12-09
-Load-Sensing-Device-Drawing-No.-:-Rdsos-Drg.-No.-Wd---01065-s-01,-Alt.-Nil.-Material-And-Specification-:-Rdsos-Str-No.-02-abr--2002,-Amend.-No.-4-Of-Sept.-2016-&-Appendix---P.-[-Warranty-Period:-36-Months-After-The>India -Load-Sensing-Device-Drawing-No.-:-Rdsos-Drg.-No.-Wd---01065-s-01,-Alt.-Nil.-Material-And-Specification-:-Rdsos-Str-No.-02-abr--2002,-Amend.-No.-4-Of-Sept.-2016-&-Appendix---P.-[-Warranty-Period:-36-Months-After-The>Supply Of Load Sensing Device Etc.
Load Sensing Device Drawing No. : Rdsos Drg. No. Wd - 01065-s-01, Alt. Nil. Material And Specification : Rdsos Str No. 02-abr- 2002, Amend. No. 4 Of Sept. 2016 & Appendix - P. [ Warranty Period: 36 Months After The
-Load-Sensing-Device-Drawing-No.-:-Rdsos-Drg.-No.-Wd---01065-s-01,-Alt.-Nil.-Material-And-Specification-:-Rdsos-Str-No.-02-abr--2002,-Amend.-No.-4-Of-Sept.-2016-&-Appendix---P.-[-Warranty-Period:-36-Months-After-The>2024-12-09
India Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Not Required; Others 2024-12-09
-Construction-Work/material-Supply.>India -Construction-Work/material-Supply.>Construction Work Of Anganvadi Kendra.
Construction Work/material Supply.
-Construction-Work/material-Supply.>2024-12-09
Whats app