Filter Search


Asia


Location Summary Deadline
Sri Lanka Fertilizer Bags And Polythene Bags, Jumbo Bags 2024-12-12
Bangladesh Development Works Including Drain From Makka Chatwar To Muslimnagar Zero Point Road, Neptune Village Road And Julhas Member Road To Rafiqul Islam School From Shaharpally Main Road To Rafiqul Islam School Through Shaharpalli Madrasa Road Under Ward-65, Zon 2024-12-12
-Supply-Installation-And-Commissioning-Of-Computer-Controlled-Microhardness-Tester>India -Supply-Installation-And-Commissioning-Of-Computer-Controlled-Microhardness-Tester>Computer-controlled Microhardness Tester
Supply Installation And Commissioning Of Computer Controlled Microhardness Tester
-Supply-Installation-And-Commissioning-Of-Computer-Controlled-Microhardness-Tester>2024-12-12
-Torque-Arm-As-Per-Clw.-Drg.-No.1210-01.118-012-Alt-1-For-Wap-5-Locos.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max>India -Torque-Arm-As-Per-Clw.-Drg.-No.1210-01.118-012-Alt-1-For-Wap-5-Locos.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max>Supply Of Torque Arm
Torque Arm As Per Clw. Drg. No.1210-01.118-012 Alt-1 For Wap-5 Locos. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max
-Torque-Arm-As-Per-Clw.-Drg.-No.1210-01.118-012-Alt-1-For-Wap-5-Locos.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max>2024-12-12
-Oil-Pump-Assly-For-Kpc-3hc55-Compressor-As-Per-Kpc-Pt.-No.-091-.-00-.-500-.-50-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/->India -Oil-Pump-Assly-For-Kpc-3hc55-Compressor-As-Per-Kpc-Pt.-No.-091-.-00-.-500-.-50-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/->Supply Of Oil Pump Assly For Kpc 3hc55 Compressor As Per Kpc Pt. No. 091 . 00 . 500 . 50
Oil Pump Assly For Kpc 3hc55 Compressor As Per Kpc Pt. No. 091 . 00 . 500 . 50 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-
-Oil-Pump-Assly-For-Kpc-3hc55-Compressor-As-Per-Kpc-Pt.-No.-091-.-00-.-500-.-50-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/->2024-12-12
Bangladesh Supplying Of Msr Medicine Non Edcl At Upazila Health Complex, Adamdighi, Bogura 2024-12-12
Korea Republic of Public Funeral Service For The Vulnerable Class In 2025~26 2024-12-12
Bangladesh Aerial Topographic Survey 2024-12-12
India Purchase Of 160 Mva, 220/132 Kv Auto Transformer Alongwith Nitrogen Injection And Fire Prevention System On Rate Contract Basis Under Bn-9016002418 2024-12-12
Japan 20-ton Track Motor Car With Generator And Crane 4 Track Motor Cars For 1, 067 Mm Gauge (narrow Gauge) 2024-12-12
Whats app