Filter Search


Asia


Location Summary Deadline
-Inside-Civil-Maintenance-And-Repair-Works-Of-D-Type-Quarters-Including-Inside-Common-Spaces-Of-Building-Nos.-D1-To-D51-(except-D34,-D49)-On-Fresh-Allotment-And-Lodged-Complaint-Basis-Upto-March-2026-A>India -Inside-Civil-Maintenance-And-Repair-Works-Of-D-Type-Quarters-Including-Inside-Common-Spaces-Of-Building-Nos.-D1-To-D51-(except-D34,-D49)-On-Fresh-Allotment-And-Lodged-Complaint-Basis-Upto-March-2026-A>Wbud Mad/slp/niet-09/2024-25 Of Ee, Slc Division
Inside Civil Maintenance And Repair Works Of D Type Quarters Including Inside Common Spaces Of Building Nos. D1 To D51 (except D34, D49) On Fresh Allotment And Lodged Complaint Basis Upto March 2026 A
-Inside-Civil-Maintenance-And-Repair-Works-Of-D-Type-Quarters-Including-Inside-Common-Spaces-Of-Building-Nos.-D1-To-D51-(except-D34,-D49)-On-Fresh-Allotment-And-Lodged-Complaint-Basis-Upto-March-2026-A>2025-02-05
India Construction Of 220kv Feeder Bay 2 Nos & 220 Kv Dcds Line From 400 Kv Ss Pithampur (mpptcl) To Proposed 220kv Mpidc Ss Sector7, Pithampur With Zebra Acsr Conductor & Construction Of 220, 132, 33 Kv Ss In Mpidc Ss Sector 7, Pithampur. 2025-02-05
-Supply-For-Set-Of-Spares-Of-Ep-Pressurized-Flushing-System-As-Per-Attached-Annexure.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Supply-For-Set-Of-Spares-Of-Ep-Pressurized-Flushing-System-As-Per-Attached-Annexure.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Supply For Set Of Spares Of Ep Pressurized Flushing System
Supply For Set Of Spares Of Ep Pressurized Flushing System As Per Attached Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Supply-For-Set-Of-Spares-Of-Ep-Pressurized-Flushing-System-As-Per-Attached-Annexure.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-02-05
-Set-Of-Hose-Pipes-Consisting--1)-Hose-Pipe-Dn-10-With-Length-10-Meter,-Nominal-Diameter-10-Mm,-Working-Pressure-700-Bar,-Approximately-13-Kg.-Qty--02-Pairs.-(hose-Pipe-T>India -Set-Of-Hose-Pipes-Consisting--1)-Hose-Pipe-Dn-10-With-Length-10-Meter,-Nominal-Diameter-10-Mm,-Working-Pressure-700-Bar,-Approximately-13-Kg.-Qty--02-Pairs.-(hose-Pipe-T>Supply Of Set Of Hose Pipes Consisting- 1) Hose Pipe Dn 10 With Length 10 Meter
Set Of Hose Pipes Consisting- 1) Hose Pipe Dn 10 With Length 10 Meter, Nominal Diameter 10 Mm, Working Pressure 700 Bar, Approximately 13 Kg. Qty- 02 Pairs. (hose Pipe T
-Set-Of-Hose-Pipes-Consisting--1)-Hose-Pipe-Dn-10-With-Length-10-Meter,-Nominal-Diameter-10-Mm,-Working-Pressure-700-Bar,-Approximately-13-Kg.-Qty--02-Pairs.-(hose-Pipe-T>2025-02-05
-Supply-And-Fitment-Of-Nitrogen-Type-Fire-Extinguisher-9-Liters-Abc-Map90-9-Kg,-Stored-Pressure-Type,-Gross-Weight-14.713-Kg,-Expellant-Medium--N2-Based,-Minimum-Disch>India -Supply-And-Fitment-Of-Nitrogen-Type-Fire-Extinguisher-9-Liters-Abc-Map90-9-Kg,-Stored-Pressure-Type,-Gross-Weight-14.713-Kg,-Expellant-Medium--N2-Based,-Minimum-Disch>Supply Of Supply And Fitment Of Nitrogen Type Fire Extinguisher 9 Liters Abc Map90
Supply And Fitment Of Nitrogen Type Fire Extinguisher 9 Liters Abc Map90 9 Kg, Stored Pressure Type, Gross Weight 14.713 Kg, Expellant Medium- N2 Based, Minimum Disch
-Supply-And-Fitment-Of-Nitrogen-Type-Fire-Extinguisher-9-Liters-Abc-Map90-9-Kg,-Stored-Pressure-Type,-Gross-Weight-14.713-Kg,-Expellant-Medium--N2-Based,-Minimum-Disch>2025-02-05
-Set-Of-Spare-Parts-Compatible-With-Electro-pneumatic-Flushing-System-Of-Imi-Norgren-Make-For-Lhb-Coaches-Consist-Of-10-Items.-1)-Pressurization-Cylinder-(-Without-Water-L>India -Set-Of-Spare-Parts-Compatible-With-Electro-pneumatic-Flushing-System-Of-Imi-Norgren-Make-For-Lhb-Coaches-Consist-Of-10-Items.-1)-Pressurization-Cylinder-(-Without-Water-L>Supply Of Set Of Spare Parts Compatible With Electro-pneumatic Flushing System
Set Of Spare Parts Compatible With Electro-pneumatic Flushing System Of Imi Norgren Make For Lhb Coaches Consist Of 10 Items. 1) Pressurization Cylinder ( Without Water L
-Set-Of-Spare-Parts-Compatible-With-Electro-pneumatic-Flushing-System-Of-Imi-Norgren-Make-For-Lhb-Coaches-Consist-Of-10-Items.-1)-Pressurization-Cylinder-(-Without-Water-L>2025-02-05
-Manufacturing-And-Supply-Of-Complete-Set-Of-Inspection-Gauges-As-Per-Rdso-Drg,-No-T-6215(part)for10125mm-Over-Ridingfan-Shaped-Curved-Switch-B.g-For-60-Kg(uic)/60el-On-Psc-Sleep>India -Manufacturing-And-Supply-Of-Complete-Set-Of-Inspection-Gauges-As-Per-Rdso-Drg,-No-T-6215(part)for10125mm-Over-Ridingfan-Shaped-Curved-Switch-B.g-For-60-Kg(uic)/60el-On-Psc-Sleep>Supply Of Manufacturing And Supply Of Complete Set Of Inspection Gauges
Manufacturing And Supply Of Complete Set Of Inspection Gauges As Per Rdso Drg, No T-6215(part)for10125mm Over Ridingfan Shaped Curved Switch B.g For 60 Kg(uic)/60el On Psc Sleep
-Manufacturing-And-Supply-Of-Complete-Set-Of-Inspection-Gauges-As-Per-Rdso-Drg,-No-T-6215(part)for10125mm-Over-Ridingfan-Shaped-Curved-Switch-B.g-For-60-Kg(uic)/60el-On-Psc-Sleep>2025-02-05
-25-Kv-Drop-Out-Fuse-Element-Capacity-1-Amp,-As-Per-Rdso-Specification-No.-Etvpsi/14(1/86)-With-A&c-Slip-No.1-Or-Latest-(as-On-Date-Of-Opening-Of-Tender)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][q>India -25-Kv-Drop-Out-Fuse-Element-Capacity-1-Amp,-As-Per-Rdso-Specification-No.-Etvpsi/14(1/86)-With-A&c-Slip-No.1-Or-Latest-(as-On-Date-Of-Opening-Of-Tender)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][q>Supply Of 25kv Drop Out Fuse Element
25 Kv Drop Out Fuse Element Capacity 1 Amp, As Per Rdso Specification No. Etvpsi/14(1/86) With A&c Slip No.1 Or Latest (as On Date Of Opening Of Tender) [ Warranty Period: 30 Months After The Date Of Delivery ][q
-25-Kv-Drop-Out-Fuse-Element-Capacity-1-Amp,-As-Per-Rdso-Specification-No.-Etvpsi/14(1/86)-With-A&c-Slip-No.1-Or-Latest-(as-On-Date-Of-Opening-Of-Tender)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][q>2025-02-05
-Rotary-Switch-With-Marking-I-0-ii-Net1-local-Main-Supply--net2-(-Change-Over-Switch-With-0-Position-3-Pole)-As-Per-Sr.-No.-7-,-Place-Of-Installation-S1s02-Of-Bill-Of-Material-Of-Rd>India -Rotary-Switch-With-Marking-I-0-ii-Net1-local-Main-Supply--net2-(-Change-Over-Switch-With-0-Position-3-Pole)-As-Per-Sr.-No.-7-,-Place-Of-Installation-S1s02-Of-Bill-Of-Material-Of-Rd>Supply Of Rotary Switch With Marking I-0-ii Net1-local Main Supply .
Rotary Switch With Marking I-0-ii Net1-local Main Supply -net2 ( Change Over Switch With 0 Position 3 Pole) As Per Sr. No.-7 , Place Of Installation S1s02 Of Bill Of Material Of Rd
-Rotary-Switch-With-Marking-I-0-ii-Net1-local-Main-Supply--net2-(-Change-Over-Switch-With-0-Position-3-Pole)-As-Per-Sr.-No.-7-,-Place-Of-Installation-S1s02-Of-Bill-Of-Material-Of-Rd>2025-02-05
-Pr-Work-In-Kanti(n.h.--28)-marwan-(n.h.---102)-Road-In-Km-6(p),-7,-8,-9>India -Pr-Work-In-Kanti(n.h.--28)-marwan-(n.h.---102)-Road-In-Km-6(p),-7,-8,-9>Pr Work In Turki Chowk (n.h. -77) To Pakki Sarai Chowk Via Madhaul, Kerma, Susta & Kachi-pakki Chowk Km. 0.00 To 10, 17 (p), 18(p) (total Length -11.10 Km) For The Year 2024-25.
Pr Work In Kanti(n.h. -28)-marwan (n.h. - 102) Road In Km 6(p), 7, 8, 9
-Pr-Work-In-Kanti(n.h.--28)-marwan-(n.h.---102)-Road-In-Km-6(p),-7,-8,-9>2025-02-05
Whats app