Filter Search


Asia


Location Summary Deadline
India Supply Of Potato, Onion And Garlic At Supply Depot Khadki And Cme Dapodi For The Period From 01 Apr 2026 To 31 Mar 2027 2025-12-16
Nepal Serma Ghat Culvert Nirman 2025-12-16
-Procurement-Of-High-End-Intraoperative-Ultrasound-For-Surgeries--01-Nos>India -Procurement-Of-High-End-Intraoperative-Ultrasound-For-Surgeries--01-Nos>Procurement Of High End Intraoperative Ultrasound For Surgeries -01 Nos
Procurement Of High End Intraoperative Ultrasound For Surgeries -01 Nos
-Procurement-Of-High-End-Intraoperative-Ultrasound-For-Surgeries--01-Nos>2025-12-16
Syria Arab Republic Equipping And Investing In The Southern Block Located At The Club’s Headquarters In The Al-shahba Neighborhood, As Stated Below: 2025-12-16
India Tender Invited For Integrated Electrosurgical Unit And Vessel Sealer (q2)##quantity: 1## 2025-12-16
Saudi Arabia A Project To Establish A Cultural Center In The Municipality Of Wadi Al-faraa Governorate 2025-12-16
-Sitc-Of-Lift-At-Salt-Lake-Sub-divisional-Hospital,-North-24-Parganas>India -Sitc-Of-Lift-At-Salt-Lake-Sub-divisional-Hospital,-North-24-Parganas>Wbpwd/ee/knhed/e-niq-35/2nd Call /(revised)/25-26
Sitc Of Lift At Salt Lake Sub-divisional Hospital, North 24 Parganas
-Sitc-Of-Lift-At-Salt-Lake-Sub-divisional-Hospital,-North-24-Parganas>2025-12-16
India Ac Cab Fan, Wall Mounting .#* Ac Cab Fan, Wall Mounting 110 Volts +/- 22.5%, 50 Hz +/- 3% With "on" - Off" Switch, Air Q uantity 20 Cubic Meter/minute At Specified Voltage As Per Clw Specn No.clw/es/f-4 Alt-g [ Warranty period: 30 Months After The Date Of 2025-12-16
-Repair-Of-C.c-Road-From-H/o-mithun-Ghosh-To-H/o-Niranjan-Sarkar-At-Booth--25/297-Under-Matigara-ii-G.p-In-Matigara-Block-(length-95.00-M-Width-4.50-M)>India -Repair-Of-C.c-Road-From-H/o-mithun-Ghosh-To-H/o-Niranjan-Sarkar-At-Booth--25/297-Under-Matigara-ii-G.p-In-Matigara-Block-(length-95.00-M-Width-4.50-M)>68/apas/mtg/bdo/25-26/1st, 19.11.25
Repair Of C.c Road From H/o-mithun Ghosh To H/o Niranjan Sarkar At Booth -25/297 Under Matigara-ii G.p In Matigara Block (length-95.00 M Width-4.50 M)
-Repair-Of-C.c-Road-From-H/o-mithun-Ghosh-To-H/o-Niranjan-Sarkar-At-Booth--25/297-Under-Matigara-ii-G.p-In-Matigara-Block-(length-95.00-M-Width-4.50-M)>2025-12-16
India Supply Of Egg And Fish Fresh At Vadodara For The Period From 01 Apr 2026 To 31 Mar 2027 2025-12-16
Whats app