Filter Search


Asia


Location Summary Deadline
Japan Purchased : Light Buoy 2025-08-25
India Air Pipe Complete For N-32 Tap Changer .#* Air Pipe Complete For N-32 Tap Changer Part No. .a-3115 & Drawing.no. Ag 330565 R1. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-25
India Pad Assembly - Lateral Thrust. .#* Pad Assembly - Lateral Thrust (wdg4 Series Locomotive) To Dlw Part No. 17022708. [ Warra nty Period: 30 Months After The Date Of Delivery ] ] 2025-08-25
Japan Fixture Delivery, Etc. (4th Floor Of The South Building Of The Main Bureau) Business Set 2025-08-25
Malaysia Tender No. Table T/p & P 138/2025 === Supply, Send, Install, Test & Certify 13 Units Of Microscope Operating Medical Equipment For Use Of Plastic Surgery Department Moh Hospitals Bg Contract Period 1 Thn 2025-08-25
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-For-Con>India -Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-For-Con>Consultancy Services For Preparation Of Detailed Project Report For Construction Of Additional 2 Lane Rob Of Chouri Chura And Deoria Rob Of Nh-727a In The State Of Uttar Pradesh
Consultancy Services For Preparation Of Detailed Project Report For Con
-Consultancy-Services-For-Preparation-Of-Detailed-Project-Report-For-Con>2025-08-25
India Construction Of Road From Km 0.000 To Km 43.65 Of Lada-sarli Section Of Nh-913 (frontier Highway) To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh. 2025-08-25
Cyprus Supply Of 20 4x4 Vehicles For Areas With Difficult Suv Access And Maintenance For 5 Years Or 100,000 Kilometers. 2025-08-25
India Cab Side Window .#* Cab Side Window Cat No.r/9/0017 As Per Drg.no. Drg.no.29172020 Alt-nil As Per Specn. Clw spec No.clw/ms/3/014 Alt-5 [ Warranty Period: 180 Months After The Date Of Delivery ] ] 2025-08-25
-Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>India -Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>Nhidcl/hq/wb/rang-sev/wvc/2025
Widening Of Valley Side At Km 20.900, Km 35.500 And Km 36.700 And Culvert At 13 Locations Viz. Km 17.600, Km 17.800, Km 18.300, Km 20.200, Km 21.500, Km 21.650, Km 21.850, Km 32.800, Km 33.100, Km 38.300, Km 40.300, Km
-Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>2025-08-25
Whats app