Korea Republic of Chungnam Region Power Supply Facility Power Plant Construction (dangjin Thermal Power Plant-sinsukmun-sinsongsan 3rd Tunnel) 2024-12-11
India Sale Of Property By Au Small Finance Bank Limited, V/s. Tarachand Chand Saini 2024-12-11
India Nib For Supply And Etc Of 2 Nos. 132 Kv Grid Sub Stations Phalsund(pokran) And Khudiyala (shergarh) Alongwith Associated Lines (25km S/c And 10km D/c Approx.) And 1 No. 132kv Bay At 132kv Gss Bandewa 2024-12-11
Kazakhstan Nvk Device 2024-12-11
India Regarding The Operation Of Accessible Toilets And Bathrooms Built At Zero Road And Saini Bus Station Under Region. 2024-12-11
India Sale Of Immovable Asset – House. 2024-12-11
-Water-Tank-Complete-Assembly,-Capacity-455-Ltr-S-Two-Piece-Design-As-Per-Icf-Drg.-No.-Icf/sk-6-3-444,-Sheet--1-To-3,-Alt-n/nil,-Of-Col.-ii.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tol>India -Water-Tank-Complete-Assembly,-Capacity-455-Ltr-S-Two-Piece-Design-As-Per-Icf-Drg.-No.-Icf/sk-6-3-444,-Sheet--1-To-3,-Alt-n/nil,-Of-Col.-ii.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tol>Supply Of Water Tank Complete Assembly
Water Tank Complete Assembly, Capacity 455 Ltr S Two Piece Design As Per Icf Drg. No. Icf/sk-6-3-444, Sheet -1 To 3, Alt-n/nil, Of Col.-ii. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tol
-Water-Tank-Complete-Assembly,-Capacity-455-Ltr-S-Two-Piece-Design-As-Per-Icf-Drg.-No.-Icf/sk-6-3-444,-Sheet--1-To-3,-Alt-n/nil,-Of-Col.-ii.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tol>2024-12-11
Turkey Building Works Will Be Carried Out 2024-12-11
Bangladesh A Construction Of Rcc Drain Muradnagor Shahid Jahed Road Ch-0.0-200.00 At Ward No -07, Under Rangunia Pourashava, Chattagram. B Maintenance Of Muradnagor West Para Road Ch-0.0-1000.00 At Ward No-7, Under Rangunia Pourashava, Chattagram. 2024-12-11
India Supply Of Family Planing Drugs For Bangalore Rural District Fy 2024-25 2024-12-11