Filter Search


Asia


Location Summary Deadline
India 3-phase Induction Motor .#* 3 Phase Induction Motor Suitable For Smoothing Reactor Cooling Blower (mv sl) Conforming To Rdso Spec. No. E/10/03/08 (revised) Sept.1995 With Amendment No. 1 & 2. A nd Clw Specn. No.clw/es/b-14/c . [ Warranty Period: 24 Months 2025-12-16
-Improvement-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-At-Kona-Naskar-Para-From-The-House-Of-Moniratan-Saddar-To-Vivekananda-Club,-Under-Ward-No-50,-Booth-No-13,-Hmc-(area-225.65m2)>India -Improvement-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-At-Kona-Naskar-Para-From-The-House-Of-Moniratan-Saddar-To-Vivekananda-Club,-Under-Ward-No-50,-Booth-No-13,-Hmc-(area-225.65m2)>Wb-hmc/nit/ed/18/ee-ii/25-26
Improvement Of Road By Cement Concrete Work (1.1.5.3) At Kona Naskar Para From The House Of Moniratan Saddar To Vivekananda Club, Under Ward No-50, Booth No-13, Hmc (area-225.65m2)
-Improvement-Of-Road-By-Cement-Concrete-Work-(1.1.5.3)-At-Kona-Naskar-Para-From-The-House-Of-Moniratan-Saddar-To-Vivekananda-Club,-Under-Ward-No-50,-Booth-No-13,-Hmc-(area-225.65m2)>2025-12-16
Japan High Voltage Electricity Used In The Keihin River Office Jurisdiction 2025-12-16
India Sealed Maintenance Free Valve Regulated Lead Acid Battery (vrla) 1100 Ah. 2025-12-16
Israel Tenders Are Invited For Upstream Oil And Gas Auditing, Inspection, Hse And Evaluation And Advisory Services With Regard To Hydroc Upstream Oil And Gas Auditing, Inspection, Hse And Evaluation And Advisory Services With Regard To Hydroc 2025-12-16
India E-auction Sale Notice For Sale Of Immovable Assets Under The Securitisation And Reconstruction Of Financial Assets And Enforcement Of The Security Interest Act 2002. The Property Is Being Sold On ''''as Is Where Is'''', ''''as Is What Is'''', And ''''what 2025-12-16
Philippines Invitation To Bid For Supply And Delivery Of Farm Machineries And Equipment Spindle Stripping Machine For Sifarmco Under Abaca Production Mcbfp-crfps Project Cy 2026 2025-12-16
-Construction-Of-Concrete-Road-From-The-House-Of-Keshab-Halder-Besidekona-Sporting-Clubground-At-Kona-Naskar-Para-Under-H.m.c-Waad-No-50-Booth-No-20,-(area-138.00-M2)(l-115.00-M-And-W-(avg.)--1.200-M)>India -Construction-Of-Concrete-Road-From-The-House-Of-Keshab-Halder-Besidekona-Sporting-Clubground-At-Kona-Naskar-Para-Under-H.m.c-Waad-No-50-Booth-No-20,-(area-138.00-M2)(l-115.00-M-And-W-(avg.)--1.200-M)>Wb-hmc/nit/ed/18/ee-ii/25-26
Construction Of Concrete Road From The House Of Keshab Halder Besidekona Sporting Clubground At Kona Naskar Para Under H.m.c Waad No-50 Booth No-20, (area-138.00 M2)(l-115.00 M And W (avg.)- 1.200 M)
-Construction-Of-Concrete-Road-From-The-House-Of-Keshab-Halder-Besidekona-Sporting-Clubground-At-Kona-Naskar-Para-Under-H.m.c-Waad-No-50-Booth-No-20,-(area-138.00-M2)(l-115.00-M-And-W-(avg.)--1.200-M)>2025-12-16
-Repairing-And-Renovation-Of-Bahitrakunda-High-School-Apas/01/216/54/0004>India -Repairing-And-Renovation-Of-Bahitrakunda-High-School-Apas/01/216/54/0004>Nit23/2025-26/contai-iii Block/13
Repairing And Renovation Of Bahitrakunda High School Apas/01/216/54/0004
-Repairing-And-Renovation-Of-Bahitrakunda-High-School-Apas/01/216/54/0004>2025-12-16
Nepal The Road Is Incomplete And Needs Improvement. 2025-12-16
Whats app