Filter Search


Asia


Location Summary Deadline
Nepal Construction Of Khudi Khola Embankment Works 2025-10-08
India 25 Kv Gapless Surge Arrester (la) As Per Clw Specification No. Clw/es/a-12, Alt- D or Latest For Conventional Electric Locos .#* 25 Kv Gapless Surge Arrester (la) As Per Clw Specification No. Clw/es/a-12, Alt- D Or Latest for Conventional Electric Locos [ 2025-10-08
-Aluminised-Rayon-/-Preox-para-aranide-Aluminisied-Suit-As-Per-Specn.no.rwf/m/specn-1/112/2009-Alt-''b''-And-Drg-No.-Rwf/misc/m-821-Alt-'d'.-]>India -Aluminised-Rayon-/-Preox-para-aranide-Aluminisied-Suit-As-Per-Specn.no.rwf/m/specn-1/112/2009-Alt-''b''-And-Drg-No.-Rwf/misc/m-821-Alt-'d'.-]>Tender Invited For Aluminised Rayon Suit
Aluminised Rayon / Preox-para-aranide Aluminisied Suit As Per Specn.no.rwf/m/specn-1/112/2009 Alt ''b'' And Drg No. Rwf/misc/m-821 Alt 'd'. ]
-Aluminised-Rayon-/-Preox-para-aranide-Aluminisied-Suit-As-Per-Specn.no.rwf/m/specn-1/112/2009-Alt-''b''-And-Drg-No.-Rwf/misc/m-821-Alt-'d'.-]>2025-10-08
Turkey Building Will Be Built 2025-10-08
India Construction Of Cc Road Rcc Drain In Ward Number 10 ,06 And Near Hilalpur Road (reserved For 2a Category) 2025-10-08
-Repair-And-Renovation-Work-Of-Office-Building-And-Construction-Of-Ug-Reservoir-Of-Falta-E.p.z-Highway-Sub-division-Under-Diamond-Harbour-Highway-Division-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26.>India -Repair-And-Renovation-Work-Of-Office-Building-And-Construction-Of-Ug-Reservoir-Of-Falta-E.p.z-Highway-Sub-division-Under-Diamond-Harbour-Highway-Division-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26.>Wbpwrd/ee/dhhd/nit-12/25-26/1
Repair And Renovation Work Of Office Building And Construction Of Ug Reservoir Of Falta E.p.z Highway Sub-division Under Diamond Harbour Highway Division In The District Of South 24 Parganas During The Year 2025-26.
-Repair-And-Renovation-Work-Of-Office-Building-And-Construction-Of-Ug-Reservoir-Of-Falta-E.p.z-Highway-Sub-division-Under-Diamond-Harbour-Highway-Division-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26.>2025-10-08
India Selection Of Agency For Design, Implementation And Management Of Ip Cctv, Itms, And Frs System On Opex Model 2025-10-08
Turkey Building Construction Will Be Carried Out 2025-10-08
Syria Arab Republic The Supply Of An Individual Cracking That Works To Compress The Quantity Air/2/two Order No. 17/2024/d 2025-10-08
Japan City Gas ; Contracted Maximum Flow Rate 170 Cubic Meters/h ; Estimated Consumption 500,000 Cubic Meters 2025-10-08
Whats app