Filter Search


Asia


Location Summary Deadline
India Bogie Brake Push Rod For Casnub Bogies .#* Bogie Brake Push Rod For Casnub Bogies To Rdso Drg. No.- Sk-69597, Alt-43, Item No.- 3 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total 2025-12-16
India Supply, Installation, Testing And Commissioning Of Various Steel Tubular Poles With Led Street Lights Under The Apas Scheme Within Ashokenagar-kalyangarh Municipality. 6.0 Mtr Steel Tubular Pole, 30 Watt Led Street Light, 7.0 Mtr Steel Tubular Pole, 70 Wa 2025-12-16
India Tender Invited For Custom Bid For Services - Hiring Of Earth Moving Equipments, Material Handling Equipments And Cranes (per Hour Basis)##quantity: 1## 2025-12-16
Bangladesh Veh Mounted Desh Speed Gun Police 2025-12-16
China Hunan Normal University’s 54th Batch Of Ultra-long-term Treasury Bonds (inductively Coupled Plasma (icp) Etching And Laser Direct Writing System Of The Institute Of Physics And Electrical Engineering) Project Public Tender Announcement 2025-12-16
India 400mm Sweep Swivel Type Universal Bldc .#* 400mm Sweep Swivel Type Universal Bldc Fan Suitable For 3 Phase Medha Memu Rake As Pe r Medha Price List Part No Sp675um101023 As Per Rdso Spec. No. Rdso/pe/spec/emu/0096-2008 (rev.4) dec 2009 With Icf Annexure N 2025-12-16
-Repair-Of-Cc-Drain-From-H/o-yamuna-Mandal-To-H/o-Samir-De-At-Booth-No-25/297-At-Matigara-ii-G.p-Under-Matigara-Block-(length---30.00m)>India -Repair-Of-Cc-Drain-From-H/o-yamuna-Mandal-To-H/o-Samir-De-At-Booth-No-25/297-At-Matigara-ii-G.p-Under-Matigara-Block-(length---30.00m)>68/apas/mtg/bdo/25-26/1st, 19.11.25
Repair Of Cc Drain From H/o-yamuna Mandal To H/o Samir De At Booth No-25/297 At Matigara-ii G.p Under Matigara Block (length - 30.00m)
-Repair-Of-Cc-Drain-From-H/o-yamuna-Mandal-To-H/o-Samir-De-At-Booth-No-25/297-At-Matigara-ii-G.p-Under-Matigara-Block-(length---30.00m)>2025-12-16
India Auction Sale Of Property Apartment/unit No, 114, Having A Super Built-up Area Of 1300 Sq. Ft., Situated At The First Floor Of The Building Known As Connection Point, Hal Airport Exit Road. 2025-12-16
India E-auction Sale Notice For Sale Of Immovable Assets Under The Securitisation And Reconstruction Of Financial Assets And Enforcement Of The Security Interest Act 2002. The Property Is Being Sold On ''''as Is Where Is'''', ''''as Is What Is'''', And ''''what 2025-12-16
-Construction-Of-Concrete-Road-From-The-House-Of-Santu-Majhi-To-Sujit-Hazra-Behundr-Kasipursporting-Club-Under-H.m.c-Waad-No-50-Booth-No-28,-(l-150.00-M-And-W-(avg.)--1.800-M)>India -Construction-Of-Concrete-Road-From-The-House-Of-Santu-Majhi-To-Sujit-Hazra-Behundr-Kasipursporting-Club-Under-H.m.c-Waad-No-50-Booth-No-28,-(l-150.00-M-And-W-(avg.)--1.800-M)>Wb-hmc/nit/ed/18/ee-ii/25-26
Construction Of Concrete Road From The House Of Santu Majhi To Sujit Hazra Behundr Kasipursporting Club Under H.m.c Waad No-50 Booth No-28, (l-150.00 M And W (avg.)- 1.800 M)
-Construction-Of-Concrete-Road-From-The-House-Of-Santu-Majhi-To-Sujit-Hazra-Behundr-Kasipursporting-Club-Under-H.m.c-Waad-No-50-Booth-No-28,-(l-150.00-M-And-W-(avg.)--1.800-M)>2025-12-16
Whats app