Filter Search


Asia


Location Summary Deadline
India Unit_5_installation Of Deep Boaring Under Pusti Gp 2025-12-15
-Supply-,installation-And-Commissioning-Of-Ac-Machine-At-International-Project-Room-And-Pi/faculty-Office-Room,-3rd-Floor,-Department-Of-Education,alipore-Campus,-University-Of-Calcutta,-Kolkata-27.>India -Supply-,installation-And-Commissioning-Of-Ac-Machine-At-International-Project-Room-And-Pi/faculty-Office-Room,-3rd-Floor,-Department-Of-Education,alipore-Campus,-University-Of-Calcutta,-Kolkata-27.>R/389/25
Supply ,installation And Commissioning Of Ac Machine At International Project Room And Pi/faculty Office Room, 3rd Floor, Department Of Education,alipore Campus, University Of Calcutta, Kolkata-27.
-Supply-,installation-And-Commissioning-Of-Ac-Machine-At-International-Project-Room-And-Pi/faculty-Office-Room,-3rd-Floor,-Department-Of-Education,alipore-Campus,-University-Of-Calcutta,-Kolkata-27.>2025-12-15
-Installation-Of-Electric-Post-In-Front-House-Of-Chatter-Mistri>India -Installation-Of-Electric-Post-In-Front-House-Of-Chatter-Mistri>Apas/01/124/171/0006
Installation Of Electric Post In Front House Of Chatter Mistri
-Installation-Of-Electric-Post-In-Front-House-Of-Chatter-Mistri>2025-12-15
-Roofing,-Installation-Of-Drinking-Water-Taps-And-Fixing-Of-Boundary-Wall-In-Icds-Centre-No---121,-Sansad-No-xxv,-Bilkanda-ii-Gp.-Approx-Benefited-73-Nos.>India -Roofing,-Installation-Of-Drinking-Water-Taps-And-Fixing-Of-Boundary-Wall-In-Icds-Centre-No---121,-Sansad-No-xxv,-Bilkanda-ii-Gp.-Approx-Benefited-73-Nos.>Bil-ii/177/apas/2025 (sl No - 1)
Roofing, Installation Of Drinking Water Taps And Fixing Of Boundary Wall In Icds Centre No - 121, Sansad No-xxv, Bilkanda-ii Gp. Approx Benefited-73 Nos.
-Roofing,-Installation-Of-Drinking-Water-Taps-And-Fixing-Of-Boundary-Wall-In-Icds-Centre-No---121,-Sansad-No-xxv,-Bilkanda-ii-Gp.-Approx-Benefited-73-Nos.>2025-12-15
India Gravity Cock .#* Gravity Cock 1/2" To Rcf Drg.no.cc63933 Alt-c [ Warranty Period: 30 Months Afte r The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 Lacs ] ] 2025-12-15
India Qrv Kit .#* Qrv Kit For Keo Type Dv Containing 15 Items As Per List Attached. [ Warranty Period: 3 6 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation permitted: Max 8 Lacs ] ] 2025-12-15
India Construction Of A Concrete Road (length 150 Ft, Breadth 3ft) From Rajas House To Fulus House, Benefiting 100 Residents,apas/01/259/260/0014 2025-12-15
India Repairing Of Road Opposite Of Adda Market Near Sharma Quarter From H/o Santosh Hela To Hanuman Mandir Ward No - 56 ,booth No-18, Borough-vii Underasansol Municipal Corporation. 2025-12-15
-Extention-Of-Pipe-Line-At-Sau-Para-Near-Subhadra-Sau-House-2.electrification-Of-Icds-Center-Including-Flooring-Water-Tap-3.construction-Of-Drain>India -Extention-Of-Pipe-Line-At-Sau-Para-Near-Subhadra-Sau-House-2.electrification-Of-Icds-Center-Including-Flooring-Water-Tap-3.construction-Of-Drain>Extention Of Pipe Lines
Extention Of Pipe Line At Sau Para Near Subhadra Sau House 2.electrification Of Icds Center Including Flooring Water Tap 3.construction Of Drain
-Extention-Of-Pipe-Line-At-Sau-Para-Near-Subhadra-Sau-House-2.electrification-Of-Icds-Center-Including-Flooring-Water-Tap-3.construction-Of-Drain>2025-12-15
India Sale Of Property By Edelweiss Asset Reconstruction Company Limited, Mumbai V/s. Fortune Assets Private Limited 2025-12-15
Whats app