Filter Search


Asia


Location Summary Deadline
India Permanent Way Zonal Contract For Maintenance Of Track Under The Jurisdiction Of senior Section Engineer, Udupi From Km 650/900 To 739/760 In Senior Regional engineer, Karwar Section Over Konkan Railway (rate Is Excluding Gst. Gst Shall Be payable As Appli 2025-10-10
Turkey Funeral Supply Will Be Purchased 2025-10-10
China Qingdao Owned Car 4s Store Decoration Modification Project 2025-10-10
India Const. Of Rcc Nalah From Pmay Site To Lata Talab At W.no. 56 2025-10-10
India Comprehensive Annual Maintenance Contract (camc) For Issdc And Mox Hpe Blade Chassis And Blade Servers For A Period Of Three Years Starting From The Date Of Release Of Purchase Order. The Work Includes Providing Oem Support Package, Ensuring Uptime Mainte 2025-10-10
-Aztec-Large-Area-Mapping>India -Aztec-Large-Area-Mapping>Aztec Large Area Mapping
Aztec Large Area Mapping
-Aztec-Large-Area-Mapping>2025-10-10
India Request For Quotation Furniture And Interior. 2025-10-10
-Dr.-B.c.roy-Post-Graduate-Institute-Of-Paediatric-Sciences--Construction-Of-Ms-Structure-Ramp-Between-Main-Hospital-Building-And-Annex-Building-During-The-Year-2025-26.>India -Dr.-B.c.roy-Post-Graduate-Institute-Of-Paediatric-Sciences--Construction-Of-Ms-Structure-Ramp-Between-Main-Hospital-Building-And-Annex-Building-During-The-Year-2025-26.>Wbpwd/sse/khc/nit-02/2025-2026
Dr. B.c.roy Post Graduate Institute Of Paediatric Sciences- Construction Of Ms Structure Ramp Between Main Hospital Building And Annex Building During The Year 2025-26.
-Dr.-B.c.roy-Post-Graduate-Institute-Of-Paediatric-Sciences--Construction-Of-Ms-Structure-Ramp-Between-Main-Hospital-Building-And-Annex-Building-During-The-Year-2025-26.>2025-10-10
India Construction Of Cc Road And Covered Rcc Drain At Maganj 03 Various Places 2025-10-10
India Tender Invited For Truck Frame Bushing Extraction/ Fitment Tool To Be Supplied As Per Specification Attached [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Per 2025-10-10
Whats app