Filter Search


Asia


Location Summary Deadline
India Providing, Laying Pvc Pipe, G.i. Pipe, Sluice Valve, Providing Household Connection, Connection With Existing Pipe Line For Water Supply Scheme Mawa, Block Nurpur Bedi, Distt. 2024-12-09
-Settlement-Of-Critical-Gap-In-Secondary-And-Primary-Grid-Pipe-Line-By-Constructing-Of-Pipe-Carrying-Structure-With-Laying-Of-610-Mm-And-508-Mm-Dia-M.s.-Pipe-In-Front-Of-Ramkrishnapur-G.p.-...>India -Settlement-Of-Critical-Gap-In-Secondary-And-Primary-Grid-Pipe-Line-By-Constructing-Of-Pipe-Carrying-Structure-With-Laying-Of-610-Mm-And-508-Mm-Dia-M.s.-Pipe-In-Front-Of-Ramkrishnapur-G.p.-...>32/5
Settlement Of Critical Gap In Secondary And Primary Grid Pipe Line By Constructing Of Pipe Carrying Structure With Laying Of 610 Mm And 508 Mm Dia M.s. Pipe In Front Of Ramkrishnapur G.p. ...
-Settlement-Of-Critical-Gap-In-Secondary-And-Primary-Grid-Pipe-Line-By-Constructing-Of-Pipe-Carrying-Structure-With-Laying-Of-610-Mm-And-508-Mm-Dia-M.s.-Pipe-In-Front-Of-Ramkrishnapur-G.p.-...>2024-12-09
India Auction Sale Of Propertyall That Self Contained Residential Flat, Identified By Modified Flat No. S-5, Located At North-western Side Of The Second Floor Of The Premises Namely Subha Puspa Pratim", Having Measurement Of 1041 Sq.ft. Super Built Up Area, Con 2024-12-09
India Repairs To Minor Bridges Under Aden/lur Sub Division. 2024-12-09
Saudi Arabia The Ministry Of The National Guard In Riyadh Needs To Fill And Maintain Gases And Cylinders 2024-12-09
-Construction-Work>India -Construction-Work>Nagla Ghurua Aganwadi Kendra
Construction Work
-Construction-Work>2024-12-09
India Auction Sale Of Propertyproperty Area Measuring 70 Sq. Yards, Admeasuring 30ft.x22.5 Ft., Having Total Covered Area 200 Sq. Ft., Situated At Baselwa Colony, Old Faridabad, Tehsil & District , Haryana , India – 121003.bounded By: East: Property Of Ramchand 2024-12-09
-Must-Change-Kit-Of-16-Items-For-3rd-Year-Maintenance-(ss-ii)-Schedule-Of-Knorr-(kbi)-Make-Air-Brake-System-Of-Lhb-Eog-Coaches-As-Specified-In-Annexure-a-[-Warranty-Period:-30-Mon>India -Must-Change-Kit-Of-16-Items-For-3rd-Year-Maintenance-(ss-ii)-Schedule-Of-Knorr-(kbi)-Make-Air-Brake-System-Of-Lhb-Eog-Coaches-As-Specified-In-Annexure-a-[-Warranty-Period:-30-Mon>Supply Of Must Change Kit Of 16 Items For 3rd Year Maintenance (ss-ii)
Must Change Kit Of 16 Items For 3rd Year Maintenance (ss-ii) Schedule Of Knorr (kbi) Make Air Brake System Of Lhb Eog Coaches As Specified In Annexure-a [ Warranty Period: 30 Mon
-Must-Change-Kit-Of-16-Items-For-3rd-Year-Maintenance-(ss-ii)-Schedule-Of-Knorr-(kbi)-Make-Air-Brake-System-Of-Lhb-Eog-Coaches-As-Specified-In-Annexure-a-[-Warranty-Period:-30-Mon>2024-12-09
India Supply Of Black Pg 16 Flexible Polyamide Conduit Pipe. Outer Dia 21.2 And Inner Dia 17mm. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2024-12-09
India Supply And Reinstallation Community Based Reverse Osmosis (ro) Plants At 3 No. Quality Affected Habitations Of Division Sri Anandpur Sahib, Distt. Rupnagar (under Head 4215/water Quality Cost) 2024-12-09
Whats app