Filter Search


Asia


Location Summary Deadline
-Work-For-Construction-Of-Intake-Well-Inside-Chambal-River-Including-Approach-Bridge-Construction-Of-Rwr-Including-All-Works-Re>India -Work-For-Construction-Of-Intake-Well-Inside-Chambal-River-Including-Approach-Bridge-Construction-Of-Rwr-Including-All-Works-Re>Chambal Alwar Bharatpur Water Supply Project Package 1 Based On Hybrid Annuity Model Ace(p) Bharatpur Nit No. 04 / 2024-25
Work For Construction Of Intake Well Inside Chambal River Including Approach Bridge Construction Of Rwr Including All Works Re
-Work-For-Construction-Of-Intake-Well-Inside-Chambal-River-Including-Approach-Bridge-Construction-Of-Rwr-Including-All-Works-Re>2025-12-29
India Tender Invited For Suitcase With Trolley (crpf) (q2)##quantity: 15207## 2025-12-29
India Lower Rubber Washer For Axle Box Guide Arrgt. Of M / Coach .#* Lower Rubber Washer For Axle Box Guide Arrgt. Of M / Coach To Icf Drg.no.emu/m-0-1-0 08 Alt.s/6(small S By 6) As Per Specn. Rdso Spec. No. R-64/98; Rev. 2 Of 2005 [ Warranty Period: 30 months 2025-12-29
India Service Shaft Furnishing And Installation And Commissioning Of Service And Auxiliary Winders At Mcp 2025-12-29
India Invited From Registered Labour Supply Mates (lsms) For Felling Of Trees, Conversions Into Timber, Pulpwood, Fuelwood Etc., Its Carriage Up To Road Side Depots (through Different Mode Of Carriage) And Further Transportation To Himkashth Sale Depots As Well 2025-12-29
Saudi Arabia Establishment, Operation And Maintenance Of The Investment Of The Land Located On Othman Bin Affan Road, May God Be Pleased With Him, North Of The Housing Clinic In The City Of Buraidah - Commercial Activities - Multi-use - Commercial Complex 2025-12-29
Turkey Purchase Of Wooden Poles. 2025-12-29
-Supply-And-E-And-C-Of-O1-No-Hvdraulic-Backhoe-Excavator-Of-3.5-To-4.00-Cum-Capacity-Derated-To-3.2-To-3.6-Cum-Bucket-Capacity-Under-Cost-Cap-Agreement-For-6-Years-Or-12000-Hours-For-Diamond-Min>India -Supply-And-E-And-C-Of-O1-No-Hvdraulic-Backhoe-Excavator-Of-3.5-To-4.00-Cum-Capacity-Derated-To-3.2-To-3.6-Cum-Bucket-Capacity-Under-Cost-Cap-Agreement-For-6-Years-Or-12000-Hours-For-Diamond-Min>Supply And E And C Of O1 No Hvdraulic Backhoe Excavator
Supply And E And C Of O1 No Hvdraulic Backhoe Excavator Of 3.5 To 4.00 Cum Capacity Derated To 3.2 To 3.6 Cum Bucket Capacity Under Cost Cap Agreement For 6 Years Or 12000 Hours For Diamond Min
-Supply-And-E-And-C-Of-O1-No-Hvdraulic-Backhoe-Excavator-Of-3.5-To-4.00-Cum-Capacity-Derated-To-3.2-To-3.6-Cum-Bucket-Capacity-Under-Cost-Cap-Agreement-For-6-Years-Or-12000-Hours-For-Diamond-Min>2025-12-29
-Work-Of-Construction-Of-Cwr-And-Block-Cwph-At-Various-Locations-For-Clusters-Laying-Of-Transfer-Main-From-Block-Ps-To-Bl>India -Work-Of-Construction-Of-Cwr-And-Block-Cwph-At-Various-Locations-For-Clusters-Laying-Of-Transfer-Main-From-Block-Ps-To-Bl>Chambal Alwar Bharatpur Water Supply Project Package-iii Based On Hybrid Annuity Model (ham) Ace(p) Bharatpur Nit No. 06/2024-25
Work Of Construction Of Cwr And Block Cwph At Various Locations For Clusters Laying Of Transfer Main From Block Ps To Bl
-Work-Of-Construction-Of-Cwr-And-Block-Cwph-At-Various-Locations-For-Clusters-Laying-Of-Transfer-Main-From-Block-Ps-To-Bl>2025-12-29
Thailand Procurement Plan: Expand The New Fire District, Ban Champa, M.7 (khum Nong Mod Ngam), Nong Na Kham Subdistrict, Mueang District, Udon Thani Province work Number C-68-d-ud2sr.0245.01.1 Extendate To New Discrete, And Champa, And M.7 (kmum Not Mod),but The C 2025-12-29
Whats app