Filter Search


Asia


Location Summary Deadline
Japan Yonago Expressway Nehara Tunnel And 2 Other Tunnel Construction Works (subject To Unsuccessful Bid Negotiations) 2024-12-11
India Supply Of Door Hinge Straight-1 As Per Drg No. Rdso/cg/drg/21043 Alt- 02, Item No 03 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2024-12-11
India Construction Of Rcc Drain At Ward No 08 Jabran Colony Ghansyam Kevat To Maansingh Daau House Municipal Council Narmadapuram Mp. 2024-12-11
-Main-Pull-Rod-Assembly-(short)-Without-Bushes-For-Bcna-Wagon-To-Rdso-Drg.-No.-Wa/bg-6354-Alt-4,-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Main-Pull-Rod-Assembly-(short)-Without-Bushes-For-Bcna-Wagon-To-Rdso-Drg.-No.-Wa/bg-6354-Alt-4,-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Main Pull Rod Assembly
Main Pull Rod Assembly (short) Without Bushes For Bcna Wagon To Rdso Drg. No. Wa/bg-6354 Alt-4, Matl. & Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Main-Pull-Rod-Assembly-(short)-Without-Bushes-For-Bcna-Wagon-To-Rdso-Drg.-No.-Wa/bg-6354-Alt-4,-Matl.-&-Spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-12-11
India Supply Of 1, 96, 500 Nos. Bakelite Tubes Different Sizes. 2024-12-11
India Repair/refurbishment Work Of Existing Pneumatic Supply System For Air Supply System In Workshop And Ibl Including All Required Labour, Consumable Etc. At Shastri Park Depot 2024-12-11
India Dismantling Of Damage Building & Construction Of Building (with Rectification Work). 2024-12-11
China Biomolecular Interaction Instrument, Fudan University 2024-12-11
India Sale Of Immovable Properties, House. 2024-12-11
India Bids For The Work Of Providing Water Supply From Bisalpur- Jaipur System For Rwss Of 130 Villages Of Sanganer Block District Jaipur Under Jjm With Oandm For 10 Year After Dlp Of 1 Year 2024-12-11
Whats app