Filter Search


Asia


Location Summary Deadline
India Construction C.c Pavement From Ghausia Masjid To Nabi Nagar Main Road, Nabi Nagar, Booth No - 158, Ward No - 95, Borough - Vii, Under Amc. 2025-12-16
India Shielding Gas (mixture Of Argon 85% +/-1% & Co2 15% +/-1%) .#* Shielding Gas (mixture Of Argon 85% +/-1% & Co2 15% +/-1%). Each Cylinder Consisting of 7 Cubic Metre, Gas Weight 12 Kgs +/-0.5 Kgs, Pressure 145 Kgs +/-1 Kg Per Sq Cm, With Manufactur es Test 2025-12-16
India Reparing Of Drain From H/o Mahesh Shaw To H/o Rambilash Shaw , Ward-70, Booth-74, Boorugh-x, Under Amc 2025-12-16
Sri Lanka Registration Of Suppliers For The Supply Of Various Materials And Services Including Electrical Equipment, Office Furniture, Stationery, Vehicle Spare Parts, Water Supply Equipment, Industrial Equipment, Building Materials, Sports Equipment, And Various R 2025-12-16
-Improvement-Of-Concrete-Road-Road-From-The-House-Of-Lt.-Swapan-Das-To-House-Of-Sourav-Dhara,-Naskar-Para-Sastitala,-Under-Hmc-Ward-No-50,-Booth-No-32,-(length-121.0m,-Wide-2.5m)>India -Improvement-Of-Concrete-Road-Road-From-The-House-Of-Lt.-Swapan-Das-To-House-Of-Sourav-Dhara,-Naskar-Para-Sastitala,-Under-Hmc-Ward-No-50,-Booth-No-32,-(length-121.0m,-Wide-2.5m)>Wb-hmc/nit/ed/18/ee-ii/25-26
Improvement Of Concrete Road Road From The House Of Lt. Swapan Das To House Of Sourav Dhara, Naskar Para Sastitala, Under Hmc Ward No-50, Booth No-32, (length-121.0m, Wide-2.5m)
-Improvement-Of-Concrete-Road-Road-From-The-House-Of-Lt.-Swapan-Das-To-House-Of-Sourav-Dhara,-Naskar-Para-Sastitala,-Under-Hmc-Ward-No-50,-Booth-No-32,-(length-121.0m,-Wide-2.5m)>2025-12-16
India Proposed Horizontal And Vertical Extension Upto G9 With Provision Of 10 Storied Of Linac Building G2 At 1, Harish Mukherjee Road For Chest And Cancer Dept. Of Ipgmer - Sskm Hospital, Kolkata ----- Electrical Works -- Sitc Of Air Conditioning System. 2025-12-16
India Emergent Protection Wall Above Chardhure Footpath Banersbeg Tukver Darjeeling 2025-12-16
India Wbphed/ee/bhm/niet_20/25-26_7, Day To Day Repair, Operation & Maintenance Of Distribution System, Rising Main And Allied Pipelines (ci/di/upvc/hdpe/gi), Valves, Valves Chambers, Stand Posts Including Repairing Of Fhtc Connection And Providing New Fhtc Con 2025-12-16
India Construction Of C.c Pavement From H/o - Laddu To H/o - Souket Imam, R.a Type, Ranga Para, Ward No - 98, Booth No - 51, Borough - Vii, Under Amc 2025-12-16
Japan Construction Work Of The Hara Tunnel, Route 1 National High-way 2025-12-16
Whats app