Filter Search


Asia


Location Summary Deadline
Malaysia Preliminary Work Of Building A Bridge On Sultan Azlan Shah Road Ft006, From Section 9.50 To 10.00, Batu Uban, Timur Laut, Penang Island Design & Soil Acquisition 2026-02-06
India Tender Invited For High Pressure Homogenizer##quantity: 1## 2026-02-06
India Supply, Installation & Testing Of 100 Kva 3-phase Servo Voltage Stabilizer With Surge protection Bbt Winding : Copper Oil Cooled, Input : 360 V - 470 V(p-p), Output : 415 V +/- 1%(p-p) As Per Technical Specification Details Attached In Two Pages. Makes: k 2026-02-06
India Restoration And Renovation Work Of The Gate Near Khedapati Hanuman Temple Located In Ward No. 47 Alakhdham Nagar. 2026-02-06
India Development Of All Weather Gsb Road Connecting Old Filter House To P Plot Area 2026-02-06
China Hunan Provincial Occupational Disease Prevention And Control Institute Health Management Center Equipment Batch Procurement Project Re-established Project Public Bidding Announcement 2026-02-06
India S&t Work In C/w Provision Of Augmentation Of Pf Shelter At 38 Stations Over The bikaner Division. 2026-02-06
India Tender Invited For Handloom Cotton Bed Sheets (v2) As Per Is 745 (q2)##quantity: 125000## 2026-02-06
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipe-Line-(di/ci/upvc/hdpe)-,-Ground-Tube-Well,-Rbtw-With-Collecting-Line,-Stand-Post-Including-Fhtc-Of>India -Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipe-Line-(di/ci/upvc/hdpe)-,-Ground-Tube-Well,-Rbtw-With-Collecting-Line,-Stand-Post-Including-Fhtc-Of>Niet No. - 27 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte.(sl. No.-01)
Day To Day Operation And Maintenance Of Distribution System And Rising Main Pipe Line (di/ci/upvc/hdpe) , Ground Tube Well, Rbtw With Collecting Line, Stand Post Including Fhtc Of
-Day-To-Day-Operation-And-Maintenance-Of-Distribution-System-And-Rising-Main-Pipe-Line-(di/ci/upvc/hdpe)-,-Ground-Tube-Well,-Rbtw-With-Collecting-Line,-Stand-Post-Including-Fhtc-Of>2026-02-06
Malaysia Upgrading The Electrical Wiring System In Sungai Buloh Prison - Phase 1 2026-02-06
Whats app