Filter Search


Asia


Location Summary Deadline
-Design,-Fabrication-And-Installation-Of-Electric-Overhead-Travelling-(eot)-Crane-(job-Work)>India -Design,-Fabrication-And-Installation-Of-Electric-Overhead-Travelling-(eot)-Crane-(job-Work)>14-viii/dsc(11-ote)24pb/t-197
Design, Fabrication And Installation Of Electric Overhead Travelling (eot) Crane (job Work)
-Design,-Fabrication-And-Installation-Of-Electric-Overhead-Travelling-(eot)-Crane-(job-Work)>2025-02-06
qty:11
>India
qty:11
>Supply Of Cable Assy H Brake, Cable Clutch, Suspension Bush Kit, Filter Oil Cartridge, Wiper Blade, Brg Clutch Release, Clutch Cover Assy, Assy Cable Complete, Pull Cable
qty:11
qty:11
>2025-02-06
-Qty-:-1200000
>India
-Qty-:-1200000
>Supply Of Iso Propyl Acetate (ipac) By One Year Rate Contract
Qty : 1200000
-Qty-:-1200000
>2025-02-06
qty:22
>India
qty:22
>Supply Of Sleeve, Fuel Return Pipe, Fuel Pipe T, Engine Mounting Pad, Injector Nozzle, Single Pump Element, Fuel Feed Pump Assy, Piston Ring Set, Aramture, Field Coil, Pinion, Rocker Arm Assy, Push Rod
qty:22
qty:22
>2025-02-06
-Flexible-Hose-Assembly-For-Sand-Ejector-As-Per-Drawing-No.-Clw-No.-0/3/65/402-Alt-4-Part-c-Nb-8x650-Lg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Flexible-Hose-Assembly-For-Sand-Ejector-As-Per-Drawing-No.-Clw-No.-0/3/65/402-Alt-4-Part-c-Nb-8x650-Lg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Flexible Hose Assembly For Sand Ejector.
Flexible Hose Assembly For Sand Ejector As Per Drawing No. Clw No. 0/3/65/402 Alt-4 Part-c Nb 8x650 Lg. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Flexible-Hose-Assembly-For-Sand-Ejector-As-Per-Drawing-No.-Clw-No.-0/3/65/402-Alt-4-Part-c-Nb-8x650-Lg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-02-06
Japan Gases Used At The National Biotechnology Center (kisarazu, Chiba Prefecture) 2025-02-06
-Estimate-For-Construction-And-Concrete-Lining-Of-Choudhary-Minor-(with-20-Percent-Enhancement)-Slice-Rd-0-16500-Including-Pucca>India -Estimate-For-Construction-And-Concrete-Lining-Of-Choudhary-Minor-(with-20-Percent-Enhancement)-Slice-Rd-0-16500-Including-Pucca>Estimate For Construction And Concrete Lining Of Choudhary Minor (with 20 Percent Enhancement) Slice Rd 0-16500 Including
Estimate For Construction And Concrete Lining Of Choudhary Minor (with 20 Percent Enhancement) Slice Rd 0-16500 Including Pucca
-Estimate-For-Construction-And-Concrete-Lining-Of-Choudhary-Minor-(with-20-Percent-Enhancement)-Slice-Rd-0-16500-Including-Pucca>2025-02-06
Philippines Continuation Of Padawil Road Lamag, Qis 2025-02-06
Philippines Renewable Energy Program-installation Of Solar Pump 40,000l At Brgy. 19 Columbia, Winter, Ilocos Norte 2025-02-06
India Bsl Divn- Bsl-bd Section- Replacement Of Steel Girders By Psc Slabs With Strengthening To Sub Structure At Bridge No. 476/1 (2/9.14m Skew) Pid No. 01.01.32.23.3.50.003 (uwp 22-23) 2025-02-06
Whats app