Filter Search


Asia


Location Summary Deadline
India Providing Of Goods Transport Services - Per Mt - Food Grains; As Per Nit Mtf; As Per Nit Mtf 2025-02-06
China Nantong Drainage Network Co., Ltd. Century Avenue Pipeline Renovation And Sewage Lifting Pump Station Project 2025-02-06
India Periodical Overhauling (poh) Of 25 Kv Circuit Breaker & 25 Kv Interrupters (alind Make) 2025-02-06
qty:1
>India
qty:1
>Supply Of 24bjol103 (engine Obm-30hp With Fuel Tank) Ey4006d- Obm-30hp
qty:1
qty:1
>2025-02-06
-Improvement-Of-Ors,-Sos-And-Ladies-Toilets-At-L-S-Road-Campus-Under-Hq-Spl-Dg-(ec)-Bsf-Kolkata>India -Improvement-Of-Ors,-Sos-And-Ladies-Toilets-At-L-S-Road-Campus-Under-Hq-Spl-Dg-(ec)-Bsf-Kolkata>Improvement Of Ors, Sos And Ladies Toilets At L S Road Campus Under Hq Spl Dg (ec) Bsf Kolkata
Improvement Of Ors, Sos And Ladies Toilets At L S Road Campus Under Hq Spl Dg (ec) Bsf Kolkata
-Improvement-Of-Ors,-Sos-And-Ladies-Toilets-At-L-S-Road-Campus-Under-Hq-Spl-Dg-(ec)-Bsf-Kolkata>2025-02-06
Pakistan Misc Service Hiring Of Qualified People Etc... 2025-02-06
India Execution Of Work Of (i) Drone And Terrestrial Lider Based Inspection Of Bridge No. 51 Up, Mid & Dn And 59 Up, Mid & Dn On Hwh-kgp Section Under Den/ East/ Kgp And (ii) Drone Based Visual Inspection (normal) Of Bridge No.235 Up & Dn And 263 Up & Dn On Kgp 2025-02-06
Philippines 25dc0110 - Convergence And Special Support Program, Basic Infrastructure Program Bip, Bip - Access Roads And/or Bridges From The National Roads Leading To Major/ Strategic Public Buildings/facilitie 2025-02-06
qty:1
>India
qty:1
>Supply Of Quad Copter
qty:1
qty:1
>2025-02-06
-Parallelism-Checking-Tool-No.-12.841.0502-(control-Jig-As-Per-Drawing-No:---2841050270with-Item-Nos.-1-To-9)-For-Control-Arm-Of-Lhb-Coaches.-As-Per-Drawing-No.-%u2013-2841050200.-[-Warranty-Period:-30-Months-After>India -Parallelism-Checking-Tool-No.-12.841.0502-(control-Jig-As-Per-Drawing-No:---2841050270with-Item-Nos.-1-To-9)-For-Control-Arm-Of-Lhb-Coaches.-As-Per-Drawing-No.-%u2013-2841050200.-[-Warranty-Period:-30-Months-After>Supply Of Parallelism Checking Tool
Parallelism Checking Tool No. 12.841.0502 (control Jig As Per Drawing No: - 2841050270with Item Nos. 1 To 9) For Control Arm Of Lhb Coaches. As Per Drawing No. %u2013 2841050200. [ Warranty Period: 30 Months After
-Parallelism-Checking-Tool-No.-12.841.0502-(control-Jig-As-Per-Drawing-No:---2841050270with-Item-Nos.-1-To-9)-For-Control-Arm-Of-Lhb-Coaches.-As-Per-Drawing-No.-%u2013-2841050200.-[-Warranty-Period:-30-Months-After>2025-02-06
Whats app