Filter Search


Asia


Location Summary Deadline
qty:1
>India
qty:1
>Supply Of Benchtop Freeze Dryer With Stabiliser (lyophiliser)
qty:1
qty:1
>2025-02-07
qty:1
>India
qty:1
>Supply Of Desktop With Apple M4 Pro
qty:1
qty:1
>2025-02-07
India Providing Of Repair, Maintenance, Installation Of Plant/ Systems/equipments (version 2) - Hospital; Amoc Of Kirloskar Make Dg Sets; Service Provider 2025-02-07
qty:5
>India
qty:5
>Supply Of Amb Ac Gas Refilling, Amb Invertor Repair, Amb Fuel Pipe Repalce, Amb Air Pipe Replace, Amb Vane Pump Repair
qty:5
qty:5
>2025-02-07
qty:4
>India
qty:4
>Supply Of Gear, Z= 28 Part No 4106001871, Pinion Shaft, Part No 4106002555, Intermediate Pinion Shaft, Part No 4106013510
qty:4
qty:4
>2025-02-07
qty:7
>India
qty:7
>Supply Of Distributor Assy, Brg Tappered Roller, Pressure Plate, Wipper Blade, Tie Rod Assy
qty:7
qty:7
>2025-02-07
qty:11
>India
qty:11
>Supply Of New Compressor (a C ) Unit, Cap: - 1 5ton, Model (make) : - Ah5522e/kch 522 Hae (kirloskar/kirloskar Co, New Compressor (a C ) Unit, Cap: - 2 Ton, Single Phase Model(make) : Ah55231e/kch528hae (kirloskar/kirl
qty:11
qty:11
>2025-02-07
-For-Providing-Electrification-Work-For-Ar/sr/deposit/mow/ow-In-Govt.-Building-F-type-Qtrs.-Under-Pwd-E/m-Sub>India -For-Providing-Electrification-Work-For-Ar/sr/deposit/mow/ow-In-Govt.-Building-F-type-Qtrs.-Under-Pwd-E/m-Sub>For Providing Electrification Work 2nd Call. P. A. C. 2521859.00 On Electrical Sor 01-01-2024, Completion Period 365 Days (i/c Rainy Season)
For Providing Electrification Work For Ar/sr/deposit/mow/ow In Govt. Building F-type Qtrs. Under Pwd E/m Sub
-For-Providing-Electrification-Work-For-Ar/sr/deposit/mow/ow-In-Govt.-Building-F-type-Qtrs.-Under-Pwd-E/m-Sub>2025-02-07
qty:416
>India
qty:416
>Supply Of Seal
qty:416
qty:416
>2025-02-07
qty:1
>India
qty:1
>Supply Of Tyre Changing Machine
qty:1
qty:1
>2025-02-07
Whats app