Filter Search


Asia


Location Summary Deadline
-Running-Contract-(rgc)-For-Supply,-Transportation,-Unloading-Of-55kv/27.5-Kv,-12.3-Mva-Auto-Transformers-With-Bushing-Ct-As-Per-Rdso-Specification-For-2*25-Kv-At-Feeding-System>India -Running-Contract-(rgc)-For-Supply,-Transportation,-Unloading-Of-55kv/27.5-Kv,-12.3-Mva-Auto-Transformers-With-Bushing-Ct-As-Per-Rdso-Specification-For-2*25-Kv-At-Feeding-System>Supply Of Running Contract For Procurement Of 12.3 Mva Auto Transformers
Running Contract (rgc) For Supply, Transportation, Unloading Of 55kv/27.5 Kv, 12.3 Mva Auto Transformers With Bushing Ct As Per Rdso Specification For 2*25 Kv At Feeding System
-Running-Contract-(rgc)-For-Supply,-Transportation,-Unloading-Of-55kv/27.5-Kv,-12.3-Mva-Auto-Transformers-With-Bushing-Ct-As-Per-Rdso-Specification-For-2*25-Kv-At-Feeding-System>2025-01-29
India Construction Of Rcc Covered Drain From Mishri Sonkar House To Rajeev Auto In Ward No 3 2025-01-29
India Purchase Of Fresh Loose Bagasse 2025-01-29
India Construction Of Cc Cover Drain With Soakpit From Hara Bauri House To Alauddin Khamar At Pursa, Sansad - Vi, Activity Id - 89955605 2025-01-29
India Rfq Cum Rfp For Programme Manager For New Cities (pmnc) For Infrastructure Development Of Orvakal Industrial Area At Kurnool District In Andhra Pradesh Under Hbic 2025-01-29
India Annual Plan-proj No 536-2024-25- Prasannan Road Concreting In Power House Ward 2025-01-29
-Grill-To-Rcf-Drawing-No.-Le-44248-Alt.a.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>India -Grill-To-Rcf-Drawing-No.-Le-44248-Alt.a.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>Supply Of Grill To Rcf Drawing No. Le 44248.
Grill To Rcf Drawing No. Le 44248 Alt.a. [ Warranty Period: 12 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac
-Grill-To-Rcf-Drawing-No.-Le-44248-Alt.a.-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lac>2025-01-29
-Pin-Electroplated-To-Icf-Drg.-No.-Emu/m-3-2-065-Alt-a.-Item-No.-4.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Pin-Electroplated-To-Icf-Drg.-No.-Emu/m-3-2-065-Alt-a.-Item-No.-4.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Pin Electroplated To Icf Drg. No. Emu/m
Pin Electroplated To Icf Drg. No. Emu/m-3-2-065 Alt-a. Item No. 4. Material And Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Pin-Electroplated-To-Icf-Drg.-No.-Emu/m-3-2-065-Alt-a.-Item-No.-4.-Material-And-Specification-As-Per-Drawing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2025-01-29
India Construction of Samskrutika Bhavan in the premises of Girls High School at Mudhol Village of Yelburga Taluk in Koppal Distrcit. 2025-01-29
India Renewal Work Of Atrauli Kasganj Road Bulapur To Khedia Dhokal Marg 2025-01-29
Whats app