Filter Search


Asia


Location Summary Deadline
Oman Investment In Land In The Industrial Area Of Al-iraqi Square, Al-rustaq, With An Area Of (2, 000 M²) 2026-02-12
India Pipe Clamp For 15 Mm N.b. Pipe .#* Pipe Clamp For 15 Mm N.b. Pipe Drawing No.:-t-6-3-767 Alt. (n) & (52) Item-4 [ Warran ty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variatio 2026-02-12
Nepal Construction Of Multipurpose Sabha Hall 2026-02-12
India Construction Of C.c Road And Drain At Ward No. 03 Kabir Marg, Patwari Gali, Dayanand Marg And Other Street. Under Municipal Council Kailaras Distt. Morena 2026-02-12
Nepal Construction Of Plum Wall At Thosne Khola, Konjyosom Ga.pa.-2,3,lalitpur. 2026-02-12
India Construction Of Integrated Elevated Metro Cum Overpass And Flyover From 14 No. Junction To Todi Mode (ch. 249.654) Of Jaipur Reengus Section Of Nh 52 In The State Of Rajasthan On Epc Mode. 2026-02-12
Japan Gpu Server Set 2026-02-12
Japan Next Generation Antivirus Software License And Support For License Management 1 Set 2026-02-12
Japan Medical Waste Disposition. 120,000? 2026-02-12
-S>India -S>Short Term Maintenance Contract From (i) Km 0.000 To Km 40.000 Of Pedana To Puttagunta Section Of Nh-216h And (ii) Km 0.000(269.900) To Km 5.122(275.022) Missing Link Of Nh -9 (new Nh-65) I.e., Connecting Nh9 And Nh5 Of Kanaka Durga Flyover, Vijay
S
-S>2026-02-12
Whats app