Filter Search


Asia


Location Summary Deadline
India Construction Of Various Buildings Of Administrative Block & Indoor School, Parade Ground With Toilets & Changing Room And Boundary Wall At Pts Bharatpur 2025-07-24
India Tender Invited For Three Phase Dlms Energy Meter -1 , Three Phase Dlms Energy Meter -2 , Single Phase Dlms Energy Meter -1 , Single Phase Dlms Energy Meter -2 , Single Phase Dlms Energy Meter -3##quantity: 33## 2025-07-24
India Tender Invited For Supply, Installation, Commissioning And Customization Of Industry 4.0 Compatible Software And Hardw##quantity: 1## 2025-07-24
Israel Purchase Of 4 Electric Operational Vehicles 2025-07-24
India Compensating Plate For Secondary Outer Spring. 2025-07-24
Bangladesh For Printing With Paper Binding And Supplying Of Textbooks Of Secondary Bangla And English Version , Dakhil, Ssc & Dakhil Vocational And Technical Trade Books Class-9 & 10, To Be Distributed Free Of Cost For The Academic Year 2026. 2025-07-24
India Auction Sale Of Property4.05 Ares Of Land In Sy. No. 29/1/2, Tp No. 19720, Block No. 4 Of Thrikkadavoor Village, Kollam Taluk. Boundareis: East: Property Of Sindhu; South: Property Of Anilkumar; West: Property Of Sudheesh; North: Road. 2025-07-24
India Three Types Of Lab Coat (doctor Type). .#* Lab Coat Doctor Type With Two Front Pockets, Size 38 (small) As Per Drawing N o.pl/misc/09/257 Dt. 28.03.25 Alt "y" To Specification No. Plw/m/safety/specn-08 (rev.-01) Date 03 .04.2025. (uploaded) [ Warranty Per 2025-07-24
India Tender Invited For Portable Radon-thoron Monitor, Data Acquisition System And Continuous Radon Progeny Monitor##quantity: 1## 2025-07-24
-Construction-Of-4-Cell-Box-Culvert-At-Sukanjuli-Road,-Harotola-Under-Infrastructure-Dev.-For-The-Year-2025-26.>India -Construction-Of-4-Cell-Box-Culvert-At-Sukanjuli-Road,-Harotola-Under-Infrastructure-Dev.-For-The-Year-2025-26.>Construction Of 4 Cell Box Culvert At Sukanjuli Road, Harotola Under Infrastructure Dev. For The Year 2025-26. (tn_02_30)
Construction Of 4 Cell Box Culvert At Sukanjuli Road, Harotola Under Infrastructure Dev. For The Year 2025-26.
-Construction-Of-4-Cell-Box-Culvert-At-Sukanjuli-Road,-Harotola-Under-Infrastructure-Dev.-For-The-Year-2025-26.>2025-07-24
Whats app