Filter Search


Asia


Location Summary Deadline
India Bolster Spring Outer .#* Bolster Spring Outer To Rdso [w] Drg. No. Wd-83069-s/1, Alt.17, Item No.1, Conforming To Rd so Specification No. Wd-01-hls-94(rev.5) Of December 2024. [ Warranty Period: 60 Months After The Date Of Deli very ] [quantity Tolerance 2025-07-22
India Tender Invited For Cylinder Rod Clevis Assembly For Secondary Lock Arrgt. Of Bobrn Wagon To Rdsos Drg. No:wd-92081-s-56, Alt.4, Item No.5. 2025-07-22
India Annual Overhaul Work In Esp Inlet Duct Including Cfd Analysis, Duct Flow Measurement Test, Attending Duct Leakages By Patch Welds Including Supply And Erection Of Diverter Plates, Honeycomb &refractory In Esp Inlet Duct During Aoh Of Unit 3 Ntps 210 Mw Bo 2025-07-22
Saudi Arabia Renting 9 Mega Com Emblems And A Screen Site On Bridges And Electronic Tunnels On The Diriyah Road (airport) In Al -qassim Region 2025-07-22
-Construction-Work>India -Construction-Work>Nagar Panchayat Mohammadabvad Ward No 06 Avantibai Nagar Me Bhadauriya Ke Tubewell Se Narendra Jatav Ke Ghar Tak Nali Avam Interlocking Karya
Construction Work
-Construction-Work>2025-07-22
Saudi Arabia Establishment, Operation And Maintenance Of A Light And Medium Industries Factory In Plot No. 75, Part (e), Located In Plan No. (h/1405) - In Al-rabi'a District - Hafar Al-batin City 2025-07-22
India Dismantling Of R.c.c Over Head Tank Of Capacity 40,000 Gallon Having 15.30 Mtr. Staging, Height Situated Near Newly Constructed 10 Beded Phc, 10(ten) Nos. Qtrs. At Mirza, Gomati Dist. Under Dws Sd, Kbn During The Year 2024-25. (2nd_call) 2025-07-22
Philippines 5020399000-1026-2025 2025-07-22
Philippines Construction Of Kalibo Quarantine Station Phase 4 2025-07-22
-Repairing-Pumping-Machineries-Pump-No.-3-With-Allied-Works-For-Clear-Water-Pump-House-(phase-i)-At-Wtp-Under-Ntk-Project.>India -Repairing-Pumping-Machineries-Pump-No.-3-With-Allied-Works-For-Clear-Water-Pump-House-(phase-i)-At-Wtp-Under-Ntk-Project.>Repair_pump
Repairing Pumping Machineries Pump No. 3 With Allied Works For Clear Water Pump House (phase-i) At Wtp Under Ntk Project.
-Repairing-Pumping-Machineries-Pump-No.-3-With-Allied-Works-For-Clear-Water-Pump-House-(phase-i)-At-Wtp-Under-Ntk-Project.>2025-07-22
Whats app