Filter Search


Asia


Location Summary Deadline
India Improvement Of Intake Channel Of Klis Phase 1st At Village Larkipora. 2025-02-11
India Construction Of Pedustal For Pipeline At Niyardih Ii Feeder Pump Canal Including All Cost Of Material (excluding Cement), Labour, Tand P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge. 2025-02-11
India Construction Of Concrete Ramp At Divisional Office Building Pulwama 2025-02-11
India All Work Of Laying, Commissioning And Testing Of A.cmazza Pipeline 350mm Reach 1.00 To 1.25 Km And Ms Pipeline 350mm Reach Km 0.00 To Km 1.00 Of The Water Distribution System Of Jagau Tola Minor Under The New Singhvahini Pump Canal.lot-11 2025-02-11
India Const Of Community Composit Pit At 2025-02-11
India All Work Of Laying, Commissioning And Testing Of A.cmazza Pipeline 350mm Reach 1.40 To 1.45 Km, Km 1.75 To 1.85 And Ms Pipeline 350mm Reach Km 1.45 To Km 1.75 Of The Water Distribution System Of Jagau Tola Mr Under New Singhvahini Pump Canal.lot-12 2025-02-11
India Construction Of B.t. Road From Kotwalo Ka Badiya To Sojat Sampark Road In W.no. 08 2025-02-11
India All Work Of Laying, Commissioning And Testing Of A.cmazza Pipeline 500mm Reach 0.00 To 0.95 Km Of The Water Distribution System Of Joravarpur Minor Under The New Singhvahini Pump Canal.lot-13 2025-02-11
India Construction Of B.t. Road From Malkoshni Road To Bera Satapadi In W.no. 01 2025-02-11
-Repairing-Toilets>India -Repairing-Toilets>Repairing Toilets Of Kamalpur T.e Icds Centre (701), Kamalpur T.e Icds Centre (703), Gandhi Memorial Primary School, Trihanna T.e Primary School, Bagdogra Hindi Primary School And O.r.d Terai T.g Primary School At Upper Bagdogra Gp
Repairing Toilets
-Repairing-Toilets>2025-02-11
Whats app