Filter Search


Asia


Location Summary Deadline
-Qty-:-14
>India
-Qty-:-14
>Tender Invited For 1 M/s Ecil Make Power Supply, 24v-36vdc, 50a Smps, 2 M/s Ecil Make Power Supply, 5 Vdc, 60a Smps, 3 M/s Ecil Make Power Supply, 5vac, 2220hz.
Qty : 14
-Qty-:-14
>2025-07-23
India Spring For Bolster Friction Device, .#* Spring For Bolster Friction Device, Rdso Drg.no.29.04.06 Alt-7, Item Ref-2. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-23
India Hq_med_(ph No.:52009) Benzocaine 2.7% W/v +paradichlorobenzene 2% w/v +chlorobutanol 5% W/v +turpentine Oil 15% W/v -cerumenolytic ear Drops - 10 Ml. .#* Hq-med-(ph No.:52009) Benzocaine 2.7% W/v +paradichlorobenzene 2% W/v + chlorobutanol 5% W/v +turpent 2025-07-23
-Drain-Work-At-W.no-09-Kalyanswami-Road-In-Tmc-Kundapura-Limits-cat-iia>India -Drain-Work-At-W.no-09-Kalyanswami-Road-In-Tmc-Kundapura-Limits-cat-iia>Drain Work At W.no 09 Kalyanswami Road In Tmc Kundapura Limits -cat-iia
Drain Work At W.no 09 Kalyanswami Road In Tmc Kundapura Limits-cat-iia
-Drain-Work-At-W.no-09-Kalyanswami-Road-In-Tmc-Kundapura-Limits-cat-iia>2025-07-23
-Customized-Uv-visible-Spectrometer-To-Be-Integrated-With-The-Matrix-Isolation-Setup>India -Customized-Uv-visible-Spectrometer-To-Be-Integrated-With-The-Matrix-Isolation-Setup>Customized Uv-visible Spectrometer To Be Integrated With The Matrix Isolation Setup
Customized Uv-visible Spectrometer To Be Integrated With The Matrix Isolation Setup
-Customized-Uv-visible-Spectrometer-To-Be-Integrated-With-The-Matrix-Isolation-Setup>2025-07-23
India Construction Of Cc Road At Ward No-15 Aykar Bhawan To S R Narshing Colleage To Dubey Ji House To Anjeev Agrwal House To Vijay Agrwal House To Mayura Wale House. ( Vidhyak Nidhi ) 2025-07-23
Philippines Supply And Delivery Of Various Ict Equipment For The Sarai Centro Project 2025-07-23
India Development Of 4-lane Access Controlled Gf Regional Expressway On Northern Side Of Hyderabad From Girmapur Village (design Ch.-1.518) To Reddipalle Village (designch.33.000) Length Of 34.518km In Telangana Under Nh(o) On Epc Mode (package-i) 2025-07-23
Pakistan Reconstruction Of Collapased/damaged Boundary Wall At Compressor Station Fc-1(dhullian) 2025-07-23
Philippines Supply And Delivery Of Twenty-six 26 Units Syringe Pump 2025-07-23
Whats app