Filter Search


Asia


Location Summary Deadline
India Soap Dish To Icf Drg. No. Icf/std-6-3-011, Alt. D. Mat. & Specn. As Per Drawing. .#* Soap Dish To Icf Drg. No. Icf/std-6-3-011, Alt. D. Mat. & Specn. As Per Drawing. [ Warr anty Period: 30 Months After The Date Of Delivery ] ] 2026-01-08
India River Erosion Mitigation Measures On Left Side Of River Beas In B/w Rd Rd 71000-72000 In Villages Mand Dhilwan In District Kapurthala. 2026-01-08
India Tender Invited For Handling ,transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service, Htc At Gs/fsd Nileshwar And Transportation To Cwcmadikai##quantity: 1## 2026-01-08
Bangladesh River Bank Protective Work Along The Left Bank Of Flood Control Embankment Of Dharla River From Km. 21.550 To Km 22.000=450 M And D/s End Termination At Sardob Areas In Union Holokhana, Uz-kurigram Sadar, Dist-kurigram Under Kurigram Wd Division, Bwdb, Ku 2026-01-08
India Repair Of Kunday Ssk Building 2026-01-08
India Open End Adopter Type Torque Wrench. 2026-01-08
-Operation-And-Guarding-Of-Pumping-Machinery-At-Sisubari-Tea-Garden-W/s-Scheme,-Block-Mal,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>India -Operation-And-Guarding-Of-Pumping-Machinery-At-Sisubari-Tea-Garden-W/s-Scheme,-Block-Mal,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>Wbphed/ee/nmd/niet- 14 Of 2025-2026 Slno 112
Operation And Guarding Of Pumping Machinery At Sisubari Tea Garden W/s Scheme, Block Mal, In The District Of Jalpaiguri Under Northern Mechanical Division, P.h. Engineering Dte.
-Operation-And-Guarding-Of-Pumping-Machinery-At-Sisubari-Tea-Garden-W/s-Scheme,-Block-Mal,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>2026-01-08
-Construction-Of-Box-Culvert-And-Missing-Alignment-Of-Kunjad-To-Kanbha-Road-On-Khari-River-Km-0/00-To-0/650-Ta.dascroi-Dist.-Ahmedabad-Package-No.-Mmgsy/scsp/03-(2024-2025)-Remaining-Work>India -Construction-Of-Box-Culvert-And-Missing-Alignment-Of-Kunjad-To-Kanbha-Road-On-Khari-River-Km-0/00-To-0/650-Ta.dascroi-Dist.-Ahmedabad-Package-No.-Mmgsy/scsp/03-(2024-2025)-Remaining-Work>Road
Construction Of Box Culvert And Missing Alignment Of Kunjad To Kanbha Road On Khari River Km 0/00 To 0/650 Ta.dascroi Dist. Ahmedabad Package No. Mmgsy/scsp/03 (2024-2025) Remaining Work
-Construction-Of-Box-Culvert-And-Missing-Alignment-Of-Kunjad-To-Kanbha-Road-On-Khari-River-Km-0/00-To-0/650-Ta.dascroi-Dist.-Ahmedabad-Package-No.-Mmgsy/scsp/03-(2024-2025)-Remaining-Work>2026-01-08
India Bearing Unit Complete Blower Side] For V [bearing Unit Complete blower Side] For Vtr-250 C And D No. M 004/380 Drg. No. B.b.c. Part No. 32] .#* Bearing Unit Complete Blower Side] For Vtr-250 C And D No. M 004/380 Drg. No. b.b.c. Part No. 32 ] 2026-01-08
Turkey Various Items Will Be Purchased 2026-01-08
Whats app