Filter Search


Asia


Location Summary Deadline
India Widening From Two Lane To Two Lane With Paved Shoulder And Strengthening At Km 1/4 - 10/2 Including Reconstruction Of Box Culvert At Km 6/6, 6/8, Construction Of New Box Culvert At Km 2/6, 7/4, Widening Of Pipe Culvert At Km 8/10, Junction Improvemen 2026-01-05
China Purchase Of Security Equipment By Shanxi Provincial Tax Bureau In 2025 2026-01-05
-Installation-Of-Decorative-Lighting-Arrangement-With-Allied-Electrical-Works-For-City-Beautification-At-Nirmal-Chandra-Street-And-Different-Places-In-Ward-No-48,-Under-Borough-v.>India -Installation-Of-Decorative-Lighting-Arrangement-With-Allied-Electrical-Works-For-City-Beautification-At-Nirmal-Chandra-Street-And-Different-Places-In-Ward-No-48,-Under-Borough-v.>Ltg/256/48/v/z-ii/25-26
Installation Of Decorative Lighting Arrangement With Allied Electrical Works For City Beautification At Nirmal Chandra Street And Different Places In Ward No-48, Under Borough-v.
-Installation-Of-Decorative-Lighting-Arrangement-With-Allied-Electrical-Works-For-City-Beautification-At-Nirmal-Chandra-Street-And-Different-Places-In-Ward-No-48,-Under-Borough-v.>2026-01-05
Turkey Medical Gas Will Be Purchased 2026-01-05
India Supply Of Overhauling Kit For Control Portion Bp (787321-1994) Of Electric Ccb System. One Set Consisting Of 63 Items As Per Kbi Annexure Attached. Pl No.- 29161897 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-05
India Construction Of Road From Beldanga Kali Mandir To Kirtan Ghosh House Mouza-beldanga,j.l No 48 Within Banasuria G.p Under Gangajalghati Dev. Block 2026-01-05
Philippines 2nd Posting Of Supply And Delivery Of Dairy Production And Equipments 2026-01-05
Bangladesh Construction Works Of A Septic Tank With Related Works For Office & Factory Area In Bcsl, Khulna 2026-01-05
-Construction-Of-Pucca-Drain-At-Sheoraphuli-On-G.t.-Road-At-Chainage-651.50km-Towards-651.43-Kmp-Under-Serampore-Sub-Division-Of-Hooghly-Division,-Pwd-During-The-Year-2025-26.>India -Construction-Of-Pucca-Drain-At-Sheoraphuli-On-G.t.-Road-At-Chainage-651.50km-Towards-651.43-Kmp-Under-Serampore-Sub-Division-Of-Hooghly-Division,-Pwd-During-The-Year-2025-26.>Wbpwd/ae/ser/nit_27/2025_2026
Construction Of Pucca Drain At Sheoraphuli On G.t. Road At Chainage 651.50km Towards 651.43 Kmp Under Serampore Sub Division Of Hooghly Division, Pwd During The Year 2025-26.
-Construction-Of-Pucca-Drain-At-Sheoraphuli-On-G.t.-Road-At-Chainage-651.50km-Towards-651.43-Kmp-Under-Serampore-Sub-Division-Of-Hooghly-Division,-Pwd-During-The-Year-2025-26.>2026-01-05
India Tender Invited For Manpower Outsourcing Services - Minimum Wage - Skilled; As Per Annexure; Healthcare , Manpower Outsourcing Services - Minimum Wage - Semi-skilled; As Per Annexure; Healthcare , Manpower Outsourcing Services - Minimum Wage - Unskilled; A 2026-01-05
Whats app