Filter Search


Asia


Location Summary Deadline
India Tender Invited For Atomic Absorption Spectrophotometer , Ft-ir With Hydrolic Press , Deep Freezer , Microscope , Hplc , Grinder Or Mixture , Flame Photometer , Ph Meter , Br Machine With Digital Display , Glassware Drier , Muffle Furnesh , Cerculating Wat 2026-01-14
-Maint-Of-Sabujshree-Seedling-During-2025-26-Under-Cooch-Behar-Division-West-Bengal>India -Maint-Of-Sabujshree-Seedling-During-2025-26-Under-Cooch-Behar-Division-West-Bengal>11/spap/cobdivn/2025-26
Maint Of Sabujshree Seedling During 2025-26 Under Cooch Behar Division West Bengal
-Maint-Of-Sabujshree-Seedling-During-2025-26-Under-Cooch-Behar-Division-West-Bengal>2026-01-14
-Repairs-And-Maintenance-Culvert-For-Road-From-Sin>India -Repairs-And-Maintenance-Culvert-For-Road-From-Sin>Repairs And Maintenance Culvert For Road From Singanahalli Jainahalli Road To Join Alambadi Kaval Via Muddalapura, Alambadi At Ch 3 50 Km In Krpete Taluk Mandya District Alambadi Village Limit Krp232
Repairs And Maintenance Culvert For Road From Sin
-Repairs-And-Maintenance-Culvert-For-Road-From-Sin>2026-01-14
Japan Disposal Of Industrial Waste Containing Low Concentration Of Pcb, 69, 999.5kg 2026-01-14
-Development-Work-(led-Street-Light)-For-The-Following-Location-In-Ward-No.-18,-Part-No.-95.-Location-B.b.-Tala-Near-Pratick-Srivastav-House.-Under-Apas-Within-Under-Halisahar-Municipality-Area>India -Development-Work-(led-Street-Light)-For-The-Following-Location-In-Ward-No.-18,-Part-No.-95.-Location-B.b.-Tala-Near-Pratick-Srivastav-House.-Under-Apas-Within-Under-Halisahar-Municipality-Area>Wbmad/ulb/hm/apas- 10(2025-26)
Development Work (led Street Light) For The Following Location In Ward No. 18, Part No. 95. Location B.b. Tala Near Pratick Srivastav House. Under Apas Within Under Halisahar Municipality Area
-Development-Work-(led-Street-Light)-For-The-Following-Location-In-Ward-No.-18,-Part-No.-95.-Location-B.b.-Tala-Near-Pratick-Srivastav-House.-Under-Apas-Within-Under-Halisahar-Municipality-Area>2026-01-14
India Tender Invited For Spec Sheet Attached , As Per Spec Sheet Attached , As Per Boq Sheet Attached , See Attached Boq Spec Sheet , Spec Pdf Attached##quantity: 355## 2026-01-14
India Construction Of Bathing Ghat At Thakur Bandh East Side 2026-01-14
India Construction Of Staff Quarters ( Type-ii 128 Units, Type-iii 50 Units Type -iv 18 unit),pump House,oht, Deep Tubewell With Irp,drain ,road Other Ancilliary Works with All Necessary Electrification Works In Connection With Lumding-furkating doubling Projec 2026-01-14
India Construction Of Shade Net House Area 240 Sqm 24m X 10m For Cultivation Of Horticulture Crops Of Dayamay Das Land 2026-01-14
India Construction Of Cc Road From Khokon Patra Land To Dipankar Maity Land 2026-01-14
Whats app