Filter Search


Asia


Location Summary Deadline
India Construction Of Dug Well At Mouza - Sardiha, J.l No- 585, Plot No- 22, G.p - Sardiha , Post- Manikpara, Block -jhargram, District -jhargram 2026-01-13
Bangladesh Construction Of 1000m Burried Pipe Line Including Purchasing 250mm Dia Upvc Pipe And Other Ancillary Materials At Jibonpur,shibgonj,bogura 2026-01-13
Kazakhstan Rollers For Machines And Equipment 2026-01-13
India Tender Invited For Electro-magnetic Lock(mha) (q3)##quantity: 35## 2026-01-13
India Installation Of 10nos Solar Light In Different Places - 1. Beside The House Of Shanti Dey At Jhapandanga Bangalpara 2. Beside The House Of Dilip Dey And 8 Others 2026-01-13
-Civil-Works>India -Civil-Works>Wbmad/ulb/kharagpur/nit 750e_2
Civil Works
-Civil-Works>2026-01-13
-Outsourcing-Of-Labour-Part-For-The-Pilot-Project-To-Rectify-Low-Lying-Pvc-Cables-At-Road-Street-Crossings>India -Outsourcing-Of-Labour-Part-For-The-Pilot-Project-To-Rectify-Low-Lying-Pvc-Cables-At-Road-Street-Crossings>12/focal Point/u-2/pilot Project/ldh/2025-26
Outsourcing Of Labour Part For The Pilot Project To Rectify Low Lying Pvc Cables At Road Street Crossings
-Outsourcing-Of-Labour-Part-For-The-Pilot-Project-To-Rectify-Low-Lying-Pvc-Cables-At-Road-Street-Crossings>2026-01-13
India Upper Rubber Washer For Axle Box .#* Upper Rubber Washer For Axle Box Guide Arrangement To Specification R 64/ 98 Rev.2 Of Dec 05 Icf Drawing No. Emu/0-1-005 Alt Q/5 Along With Latest Amendment Alter ation If Any. [ Warranty Period: 30 Months After The Da 2026-01-13
Kazakhstan Procurement Of Services For The Provision Of Licenses For The Right To Use Software 2026-01-13
-Electrical-Parts-For-Conversion-Of-Group-Control-Arrangement-To-Individual-Control-Arrangement-Of-(2x6.3mva)-33/11kv-Transformer-At-Raghunathpur-Sub-station-Under-Durgapur-Division.>India -Electrical-Parts-For-Conversion-Of-Group-Control-Arrangement-To-Individual-Control-Arrangement-Of-(2x6.3mva)-33/11kv-Transformer-At-Raghunathpur-Sub-station-Under-Durgapur-Division.>Sevice Related Work
Electrical Parts For Conversion Of Group Control Arrangement To Individual Control Arrangement Of (2x6.3mva) 33/11kv Transformer At Raghunathpur Sub-station Under Durgapur Division.
-Electrical-Parts-For-Conversion-Of-Group-Control-Arrangement-To-Individual-Control-Arrangement-Of-(2x6.3mva)-33/11kv-Transformer-At-Raghunathpur-Sub-station-Under-Durgapur-Division.>2026-01-13
Whats app